Back to bathroom remodel contractors
Quality Interiors
- Based in
- Elk Grove
- On San Francisco permits
- Jan 2001 to Feb 2017
- Last 24 months
- 0 permits filed
25 permits since 2000: 19 completed, 6 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2017 | Completed final sign-off Apr 2017 | 3429 Divisadero St | bathroom remodel: remove/replace fixtures & finishes; no change to layout.Details
bathroom remodel: remove/replace fixtures & finishes; no change to layout. | $20,000 |
| Jul 3, 2014 | Completed final sign-off Feb 2015 | 2018 California St | remove sauna and spa room intall without permit. reinstall the bedrooms, a laundry room and a bathroom. including electrical and plumbing associated w/work. replace 3 windows to match existing. reinstall wall which is removed without permit.Details
remove sauna and spa room intall without permit. reinstall the bedrooms, a laundry room and a bathroom. including electrical and plumbing associated w/work. replace 3 windows to match existing. reinstall wall which is removed without permit. | $35,000 |
| Sep 21, 2009 | Completed final sign-off Feb 2010 | 4466 24th St | remodel bathroom, living room. demo bathroom to studs and install new sheetrock, tile , plumbing & electrical fixtures in same locations. replace fireplace with new fire place & surrands. provide h.e. light per t-24.Details
remodel bathroom, living room. demo bathroom to studs and install new sheetrock, tile , plumbing & electrical fixtures in same locations. replace fireplace with new fire place & surrands. provide h.e. light per t-24. | $20,000 |
| Oct 5, 2004 | Completed final sign-off Mar 2005 | 977 Duncan St | demo bathroom to studs,replace w/new sheetrock,new fixtures (e) location & finishes.Details
demo bathroom to studs,replace w/new sheetrock,new fixtures (e) location & finishes. | $10,000 |
| Jan 2, 2001 | Expired or cancelled expired Jan 2002 | 307 Page St | kitchen & bath remodal, demo to stops new rocks, cabs, appliances & fixtures, new paint/hardwood fl.Details
kitchen & bath remodal, demo to stops new rocks, cabs, appliances & fixtures, new paint/hardwood fl. | $50,000 |