Quality Construction**Check Id**
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Mar 2014
- Last 24 months
- 0 permits filed
26 permits since 2000: 25 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 1 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2013 | Completed final sign-off Apr 2014 | 100 Amazon Av | replace cabinets in kitchen. replace toilet, vanity set & tiles in bathroom.Details
replace cabinets in kitchen. replace toilet, vanity set & tiles in bathroom. | $3,000 |
| May 30, 2013 | Completed final sign-off Apr 2018 | 2850 Ulloa St | replace (e) dryrotted front stair, infill approx 82 sq. ft. under fornt portion of the house, construct a (n) bathroom in the (e) lower floor. replace (3) dry rotted windows @ 2nd floor living room.Details
replace (e) dryrotted front stair, infill approx 82 sq. ft. under fornt portion of the house, construct a (n) bathroom in the (e) lower floor. replace (3) dry rotted windows @ 2nd floor living room. | $40,000 |
| Feb 19, 2013 | Completed final sign-off May 2013 | 1202 Jackson St | remodel kitchen, bathroom & install 5 baseboard heater & a sub panel, replace switches & outlets.Details
remodel kitchen, bathroom & install 5 baseboard heater & a sub panel, replace switches & outlets. | $14,000 |
| Nov 19, 2012 | Completed final sign-off Feb 2013 | 1383 35th Av | 1 bedroom, bath, storage room, laundry and tool room to be constructed at gr fl per plan, remove (e) posts and install new beam at g/f, remodel (e) bathroom at 2/f.Details
1 bedroom, bath, storage room, laundry and tool room to be constructed at gr fl per plan, remove (e) posts and install new beam at g/f, remodel (e) bathroom at 2/f. | $48,000 |
| Jul 9, 2012 | Completed final sign-off Jun 2013 | 3835 25th St | remodel bathroom, relocate sink & shower pan. no structural work.Details
remodel bathroom, relocate sink & shower pan. no structural work. | $4,000 |
| Sep 21, 2011 | Completed final sign-off Jan 2012 | 1455 32nd Av | add 2 bedrooms, 1 full bathroom & 1 storage at ground floor (garage)Details
add 2 bedrooms, 1 full bathroom & 1 storage at ground floor (garage) | $25,000 |
| Sep 14, 2011 | Completed final sign-off Feb 2012 | 11 Seminole Av | construct 1 bedroom, 1 family room, 2 bathrooms, 2 storage one (e) ground floorDetails
construct 1 bedroom, 1 family room, 2 bathrooms, 2 storage one (e) ground floor | $45,000 |
| Sep 3, 2010 | Completed final sign-off Feb 2011 | 2143 41st Av | interior remodel. 1. add one family room, one bedroom, one storage, one bath at garage floor.Details
interior remodel. 1. add one family room, one bedroom, one storage, one bath at garage floor. | $40,000 |
| Aug 11, 2010 | Completed final sign-off Jul 2011 | 312 Ridgewood Av | remodel kitchen & bathrooms, repairing deck less than 50%. change water heater & furnace in same location. change incoming water line from street to house. install new lighting. change window in kitchen/lightwellDetails
remodel kitchen & bathrooms, repairing deck less than 50%. change water heater & furnace in same location. change incoming water line from street to house. install new lighting. change window in kitchen/lightwell | $28,000 |
| May 24, 2010 | Completed final sign-off Aug 2010 | 514 05th Av | remodel kitchen and remove pantry and associated non bearing partition walls. convert (e) bathrm into one full bath and one-half bath room incl. new tub, toilets, vanities, tiled floor and exhaust fan on main/second floor.Details
remodel kitchen and remove pantry and associated non bearing partition walls. convert (e) bathrm into one full bath and one-half bath room incl. new tub, toilets, vanities, tiled floor and exhaust fan on main/second floor. | $10,000 |
| Nov 30, 2009 | Completed final sign-off May 2010 | 579 42nd Av | to comply with nov 200922744. legalized bedroom & toilet room at first floor. removed illegal kitchen & reduced the area of the bathroom.Details
to comply with nov 200922744. legalized bedroom & toilet room at first floor. removed illegal kitchen & reduced the area of the bathroom. | $20,000 |
| Aug 27, 2008 | Completed final sign-off Dec 2008 | 90 Curtis St | construct 2 bedrooms, laundry room & one full bathroom at ground floor.Details
construct 2 bedrooms, laundry room & one full bathroom at ground floor. | $42,000 |
| Oct 2, 2007 | Completed final sign-off Jun 2008 | 637 Thornton Av | remodel existing kitchen and bathroom, add new bathroom , add new beam @ kitchen/ all work on 2nd floorDetails
remodel existing kitchen and bathroom, add new bathroom , add new beam @ kitchen/ all work on 2nd floor | $32,000 |