Back to bathroom remodel contractors
Quality Construction By V M
- Based in
- Rancho Cordova
- On San Francisco permits
- Nov 2010 to Jan 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 1 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2013 | Completed final sign-off May 2013 | 201 Harrison St | remodel of kitkchen & bathroom, removal & replacement of existing cabinets,updating electricla per city code, new appliances,sink disposal granite countertops no structural changes,add 4 led high effeciency recessed lights new vanity in bathroom. new floor replace in kind no window or doors/unit 410Details
remodel of kitkchen & bathroom, removal & replacement of existing cabinets,updating electricla per city code, new appliances,sink disposal granite countertops no structural changes,add 4 led high effeciency recessed lights new vanity in bathroom. new floor replace in kind no window or doors/unit 410 | $14,000 |
| Jan 24, 2012 | Completed final sign-off Jun 2012 | 201 Harrison St | remodel two (e) bathrooms at unit #409: replacing both vanity, cabinets, new tiles on floor and walls, lighting fixture at same location. no wall relocation. permanently installed lights shall be high efficacy unless they are controlled by manual on occupancy sensors -cec150(k)10Details
remodel two (e) bathrooms at unit #409: replacing both vanity, cabinets, new tiles on floor and walls, lighting fixture at same location. no wall relocation. permanently installed lights shall be high efficacy unless they are controlled by manual on occupancy sensors -cec150(k)10 | $6,900 |