Back to bathroom remodel contractors
Qualisopus Construction
- Based in
- San Rafael
- On San Francisco permits
- Jun 2021 to Apr 2023
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 34 days from filing to permit and 454 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2022 | Completed final sign-off Jun 2023 | 1524 36th Av | down to the studs remodel of an existing bathroom to include new fixtures, finishes, lighting and windows at second floorDetails
down to the studs remodel of an existing bathroom to include new fixtures, finishes, lighting and windows at second floor | $30,000 |
| Oct 8, 2021 | Completed final sign-off Dec 2023 | 2177 17th Av | the project involves the down to the studs remodel of (e) kitchen & bathroom on level 2. removal of walls and new finishes @ media room; replacement of (e) deck w/a new deck & stairs. new windows & sidingDetails
the project involves the down to the studs remodel of (e) kitchen & bathroom on level 2. removal of walls and new finishes @ media room; replacement of (e) deck w/a new deck & stairs. new windows & siding | $95,000 |