Back to bathroom remodel contractors
Qins Construction
- Based in
- San Leandro
- On San Francisco permits
- Sep 2010 to Feb 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 39 days from filing to permit and 378 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2021 | Completed final sign-off Feb 2022 | 1425 Mcallister St | 1/2 wall 50in tall, open 36in doorway. remodel kitchen. hallway ceiling from 10ft by framing w/ 2x4, lowering hallway ceiling by 10in. new closet. to comply with nov 202172341: to legalize unwarranted bathroom work in master bathroom per planDetails
1/2 wall 50in tall, open 36in doorway. remodel kitchen. hallway ceiling from 10ft by framing w/ 2x4, lowering hallway ceiling by 10in. new closet. to comply with nov 202172341: to legalize unwarranted bathroom work in master bathroom per plan | $15,000 |
| Apr 24, 2017 | Completed final sign-off Aug 2018 | 48 Miraloma Dr | remodel (e) kitchen with new cabinets, new tile flooring, new appliances. replace 10 wood double hung windows & 1 bay window with new dual paned windows, low e2 glazing, non street facing. remodel (e) 3 bathrooms, retile floors & shower, replace bathtub, replace vanity, overhead lights.Details
remodel (e) kitchen with new cabinets, new tile flooring, new appliances. replace 10 wood double hung windows & 1 bay window with new dual paned windows, low e2 glazing, non street facing. remodel (e) 3 bathrooms, retile floors & shower, replace bathtub, replace vanity, overhead lights. | $30,000 |