Back to bathroom remodel contractors
Q & Q Electric Co. Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Sep 2025
- Last 24 months
- 2 permits filed
11 permits since 2000: 7 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 223 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 10, 2024 | Completed final sign-off Nov 2024 | 130 Pope St | reference to complaint 202429241. remodel (2) bathrooms and reconfigure kitchen layout per plan.Details
reference to complaint 202429241. remodel (2) bathrooms and reconfigure kitchen layout per plan. | $60,000 |
| Jun 21, 2021 | Completed final sign-off Jan 2022 | 355 Girard St | 2nd flr - relocated kitchen & living room. add (1) full bath. replace interior plaster finishes w/ 5/8" type "x" gyp. bd. & add insulation at 2nd flr/ replace all rear windows-not visible from street.Details
2nd flr - relocated kitchen & living room. add (1) full bath. replace interior plaster finishes w/ 5/8" type "x" gyp. bd. & add insulation at 2nd flr/ replace all rear windows-not visible from street. | $35,000 |
| Jun 3, 2021 | Completed final sign-off Jan 2022 | 355 Girard St | 1 kitchen 1 bath remodel in kind on 2nd floor.Details
1 kitchen 1 bath remodel in kind on 2nd floor. | $15,000 |
| Nov 22, 2019 | Completed final sign-off Sep 2020 | 1008 Goettingen St | 1) revision to app#201910295865, relocate kitchen, dining, add 2 skylights, and rear deck at 2nd floor. 2) add one bedroom, one and half bath at 1st floor. 3) remove decorated stone veneer siding at front & restore back to stucco finishes.Details
1) revision to app#201910295865, relocate kitchen, dining, add 2 skylights, and rear deck at 2nd floor. 2) add one bedroom, one and half bath at 1st floor. 3) remove decorated stone veneer siding at front & restore back to stucco finishes. | $50,000 |
| Jul 8, 2016 | Completed final sign-off Jul 2017 | 2 Sparta St | replace one kitchen cabinets, counter top, appliances, replace (3) full bath fixtures and tiles. no structural work, same configurationDetails
replace one kitchen cabinets, counter top, appliances, replace (3) full bath fixtures and tiles. no structural work, same configuration | $23,000 |
| Sep 10, 2015 | Never finaled issued Sep 2015, no final | 342 Harkness Av | remodel kitchen & two full bath @ 2nd floor, no structural work.Details
remodel kitchen & two full bath @ 2nd floor, no structural work. | $15,000 |