Back to bathroom remodel contractors
Pulcher U S A Inc
- Based in
- Santa Clara
- On San Francisco permits
- Dec 2013 to Aug 2014
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 438 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2014 | Completed final sign-off Mar 2016 | 355 Buena Vista East Av | #608w -kitchen & bathroom remodel; to comply with cec150.0(k)3 & 5; demo kitchen & bath, remove(e) flooring, update electrical to led can (7), add 2 led lights in closet, install new tub, vanity, kitchen cabinet, may use(e) counter top, hardwood floor & paint, layout stays the sameDetails
#608w -kitchen & bathroom remodel; to comply with cec150.0(k)3 & 5; demo kitchen & bath, remove(e) flooring, update electrical to led can (7), add 2 led lights in closet, install new tub, vanity, kitchen cabinet, may use(e) counter top, hardwood floor & paint, layout stays the same | $10,000 |
| Dec 18, 2013 | Completed final sign-off Oct 2014 | 15 Galilee Ln | replace kitchen cabinets and tile bathroom floor, replace toilet vanity, touch up paint bathroom & hallway. no doors & no windows.Details
replace kitchen cabinets and tile bathroom floor, replace toilet vanity, touch up paint bathroom & hallway. no doors & no windows. | $15,000 |