Proyecto

Contractor license
1052591
State license record
Based in
Oakland
On San Francisco permits
Jan 2019 to Sep 2021
Last 24 months
0 permits filed

10 permits since 2000: 9 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllStairs 1Kitchen remodel 3Bathroom remodel 6

6 bathroom remodel permits: 6 completed. Typically 94 days from filing to permit and 454 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 17, 2021Completed
final sign-off Mar 2024
815 Miramar Avproposed 1215 sq ft adu in lower level of house. adu to include (n) bedroom, (n) bathroom, (n) kitchen, (n) dining room and (n) craft room.
Details
Permit
202109178692
Status
complete
Filed
Sep 17, 2021
Permit issued
May 12, 2022
Final sign-off
Mar 6, 2024
Declared cost
$200,000
Address
815 Miramar Av

proposed 1215 sq ft adu in lower level of house. adu to include (n) bedroom, (n) bathroom, (n) kitchen, (n) dining room and (n) craft room.

Open the permit page

$200,000
Jan 14, 2021Completed
final sign-off Sep 2021
33 Miraloma Drremodel e bath. no structural work. no new wall and no existing wall relocation. all new plumbing fixtures reamin at e locations. new lighting shall comply with cec 150.k5
Details
Permit
202101142642
Status
complete
Filed
Jan 14, 2021
Permit issued
Jan 14, 2021
Final sign-off
Sep 16, 2021
Declared cost
$30,000
Address
33 Miraloma Dr

remodel e bath. no structural work. no new wall and no existing wall relocation. all new plumbing fixtures reamin at e locations. new lighting shall comply with cec 150.k5

Open the permit page

$30,000
Sep 3, 2020Completed
final sign-off Jan 2021
812 Lyon Stunit b: remodel 2 existing bathrooms no structural. all work in kind
Details
Permit
202009033357
Status
complete
Filed
Sep 3, 2020
Permit issued
Sep 3, 2020
Final sign-off
Jan 14, 2021
Declared cost
$60,000
Address
812 Lyon St

unit b: remodel 2 existing bathrooms no structural. all work in kind

Open the permit page

$60,000
Sep 3, 2020Completed
final sign-off Mar 2021
442 Sanchez Stunit #101: remodel (e) kitchen & bath , no structural, all work in kind. **maher n/a**
Details
Permit
202009033350
Status
complete
Filed
Sep 3, 2020
Permit issued
Sep 3, 2020
Final sign-off
Mar 2, 2021
Declared cost
$58,000
Address
442 Sanchez St

unit #101: remodel (e) kitchen & bath , no structural, all work in kind. **maher n/a**

Open the permit page

$58,000
Dec 16, 2019Completed
final sign-off May 2023
481 Teresita Blflr 2 reconstruct interior stair to flr 1 & basement, create habitable area behind garage(master bedroom, bath & office) basement: create habitable rec room, replace front exterior steps in-kind
Details
Permit
201912169665
Status
complete
Filed
Dec 16, 2019
Permit issued
Apr 8, 2021
Final sign-off
May 1, 2023
Declared cost
$150,000
Address
481 Teresita Bl

flr 2 reconstruct interior stair to flr 1 & basement, create habitable area behind garage(master bedroom, bath & office) basement: create habitable rec room, replace front exterior steps in-kind

Open the permit page

$150,000
Jan 11, 2019Completed
final sign-off Oct 2021
125 Pioche Stpartial 2nd floor addition, rear yard addition, no modification to front elevation. 2 new bedrooms & 1 new bathroom. 3 bedrooms & 2 baths final count.
Details
Permit
201901110151
Status
complete
Filed
Jan 11, 2019
Permit issued
Jul 18, 2019
Final sign-off
Oct 7, 2021
Declared cost
$150,000
Address
125 Pioche St

partial 2nd floor addition, rear yard addition, no modification to front elevation. 2 new bedrooms & 1 new bathroom. 3 bedrooms & 2 baths final count.

Open the permit page

$150,000