Back to bathroom remodel contractors
Proficient Termite And Construction Co
- Based in
- Pinole
- On San Francisco permits
- Jun 2022 to Jan 2025
- Last 24 months
- 3 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2022 | Completed final sign-off Jan 2023 | 226 Monterey Bl | 1. update electrical in area we work both bath and kitchen. install hvac. 2. remodel baths in like with low flow plumbing and update electric. 3. remove existing wood panelling and install insulation and sheetrock in 1st floor. 4. remodeling kitchen in kindDetails
1. update electrical in area we work both bath and kitchen. install hvac. 2. remodel baths in like with low flow plumbing and update electric. 3. remove existing wood panelling and install insulation and sheetrock in 1st floor. 4. remodeling kitchen in kind | $82,000 |