- 3 permits filed
21 permits since 2000: 15 completed, 4 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 2 days from filing to permit and 448 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2025 | Completed final sign-off Mar 2026 | 736 Haight St | unit 736-remodel (e) bathroom to include remove bathtub and add showerDetails
unit 736-remodel (e) bathroom to include remove bathtub and add shower | $12,000 |
| Apr 18, 2022 | Completed final sign-off Jul 2023 | 3866 Clay St | revision to pa# 201910114294. work will include minor interior changes on (e) 1st & 2nd levels. no structural changes. no exterior changes. add 1 bathroom.Details
revision to pa# 201910114294. work will include minor interior changes on (e) 1st & 2nd levels. no structural changes. no exterior changes. add 1 bathroom. | |
| Oct 21, 2021 | Never finaled issued Nov 2021, no final | 728 Hayes St | remodel 1 kitchen, 2 bathrooms, new led recessed lighting throughout, remove and replace ceiling surface complete for new lighting wall surfaces as needed, interior doors trims. no alternation of wall, window, or door.Details
remodel 1 kitchen, 2 bathrooms, new led recessed lighting throughout, remove and replace ceiling surface complete for new lighting wall surfaces as needed, interior doors trims. no alternation of wall, window, or door. | $40,000 |
| Sep 8, 2021 | Completed final sign-off Oct 2023 | 710 Hayes St | unit 710 @ 1/f: interior remodel, kitchen remodel, new interior partition layout, (1) new bath, (2) bath remodel, new fixtures/finishes/dry wall; penthouse: remodel, new patio door, new windows, new balcony & guardrail, dry rot repair. sprinkler penthouse and exit stair with nfpa 13r.Details
unit 710 @ 1/f: interior remodel, kitchen remodel, new interior partition layout, (1) new bath, (2) bath remodel, new fixtures/finishes/dry wall; penthouse: remodel, new patio door, new windows, new balcony & guardrail, dry rot repair. sprinkler penthouse and exit stair with nfpa 13r. | $175,000 |
| Aug 5, 2021 | Completed final sign-off Apr 2022 | 1002 Masonic Av | unit 3: remodel of kitchen- bathroom, new led light fixtures and ceiling replacement . replace 9 wood windows in knd , new doors and trims. no structural work. windows will be hung, wood with og lugsDetails
unit 3: remodel of kitchen- bathroom, new led light fixtures and ceiling replacement . replace 9 wood windows in knd , new doors and trims. no structural work. windows will be hung, wood with og lugs | $30,000 |
| Apr 5, 2021 | Completed final sign-off Nov 2021 | 1004 Masonic Av | unit#6(3rd flor) - remodel of kitchen and 2 bathrooms, (n) led light fixtures & ceiling replacement, replace 6 wood windows in kind. (n) doors & trims. no structural work. wood windows being hung and with og lugsDetails
unit#6(3rd flor) - remodel of kitchen and 2 bathrooms, (n) led light fixtures & ceiling replacement, replace 6 wood windows in kind. (n) doors & trims. no structural work. wood windows being hung and with og lugs | $48,000 |
| Mar 3, 2021 | Completed final sign-off Oct 2023 | 712 Hayes St | no structural or framing work. remodel kitchen and 3 baths. new plumbing, lighting and electrical throughout, ceiling surface removed for lighting, walls opened as needed less than 20%, new cabinets & finishes.Details
no structural or framing work. remodel kitchen and 3 baths. new plumbing, lighting and electrical throughout, ceiling surface removed for lighting, walls opened as needed less than 20%, new cabinets & finishes. | $30,000 |
| Dec 16, 2020 | Completed final sign-off Oct 2023 | 714 Hayes St | comply w/ #202067181: remove load-bearing partition. remodel kitchehn, new master bath & walkin closet, new full bath at hallway, bedrooms 3 & 4. replacement of fixtures, finishes, & drywall throughout. (2) infill of 2 property line windows at east elevations.Details
comply w/ #202067181: remove load-bearing partition. remodel kitchehn, new master bath & walkin closet, new full bath at hallway, bedrooms 3 & 4. replacement of fixtures, finishes, & drywall throughout. (2) infill of 2 property line windows at east elevations. | $100,000 |