Back to bathroom remodel contractors
Pro-Construction
- Based in
- Bay Point
- On San Francisco permits
- Jun 2025 to May 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 in progress. Typically 27 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2026 | In progress issued Jun 2026 | 2140 Sutter St | to comply with nov 202538778 at 4/fl to remove (e) plumbing fixtures and door. infill door opening and provide (n) attic access. 3/fl legalize (e) window infill at bathroom. add a (n) closet. 1/fl- legalize (e) window replacement in kind not visible from streetDetails
to comply with nov 202538778 at 4/fl to remove (e) plumbing fixtures and door. infill door opening and provide (n) attic access. 3/fl legalize (e) window infill at bathroom. add a (n) closet. 1/fl- legalize (e) window replacement in kind not visible from street | $2,600 |