Back to bathroom remodel contractors
Prinova Construction
- Based in
- Daly City
- On San Francisco permits
- Feb 2012 to Jun 2022
- Last 24 months
- 0 permits filed
20 permits since 2000: 17 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2022 | Expired or cancelled expired Mar 2025 | 142 Brighton Av | replace rotten studes & base plant on the kitchen wall.building 2 bathrooms & a double closet in the bedroom.install 5/8in sheetrock all over needed.full upgrade the electrical & plumbing.install siding at the exterior front side of house.Details
replace rotten studes & base plant on the kitchen wall.building 2 bathrooms & a double closet in the bedroom.install 5/8in sheetrock all over needed.full upgrade the electrical & plumbing.install siding at the exterior front side of house. | $57,600 |
| Mar 8, 2017 | Completed final sign-off Jun 2017 | 1720 Hyde St | upgrade the kitchen cabinets & bathroomDetails
upgrade the kitchen cabinets & bathroom | $19,000 |
| Jul 14, 2016 | Completed final sign-off Dec 2016 | 385 Hazelwood Av | new bathroom at first floor (garage level).Details
new bathroom at first floor (garage level). | $13,739 |
| Dec 17, 2015 | Completed final sign-off Jan 2017 | 1044 Pine St | unit #1: kitchen and bathroom remodel. no structural change.Details
unit #1: kitchen and bathroom remodel. no structural change. | $26,000 |
| Oct 22, 2015 | Completed final sign-off Dec 2015 | 644 Hearst Av | upgrade bathroom - note: this permit does not constitute a legal bathroom at 1st floor. bathroom remodel only. no structural work. no wall modification.Details
upgrade bathroom - note: this permit does not constitute a legal bathroom at 1st floor. bathroom remodel only. no structural work. no wall modification. | $9,000 |
| May 28, 2015 | Completed final sign-off Oct 2015 | 1250 Broderick St | rmodel kitchen and bath. no structural work. same layoutDetails
rmodel kitchen and bath. no structural work. same layout | $25,600 |
| Nov 12, 2014 | Completed final sign-off Jun 2015 | 420 Somerset St | comply with violation 201405831. replace kitchen cabinets and countertop, remodel 2 bathsDetails
comply with violation 201405831. replace kitchen cabinets and countertop, remodel 2 baths | $15,000 |
| Sep 12, 2014 | Completed final sign-off Mar 2015 | 1718 Hyde St | upgrade the kitchen cabinets & bathroom (one kitchen, one bath).Details
upgrade the kitchen cabinets & bathroom (one kitchen, one bath). | $18,000 |
| Jun 17, 2014 | Completed final sign-off Jan 2015 | 1728 Hyde St | upgrade the kitchen cabinets and bathroom.Details
upgrade the kitchen cabinets and bathroom. | $13,600 |