Back to bathroom remodel contractors
Primus Construction
- Based in
- San Jose
- On San Francisco permits
- Sep 2008 to Jan 2010
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 12 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2009 | Completed final sign-off Feb 2010 | 2290 Green St | const a connecting stair fr 2nd fl to ground fl to multi-use rm w/ bathrm & wine cellar, excavate one foot more or less to have 8' ceiling, at unit 2 @ rear, relocate bathrm from 1st fl to 2nd fl, remodel (e)kitchen and (n)half bath, install plywood sheathing, steel bm & upgrade new foundation perDetails
const a connecting stair fr 2nd fl to ground fl to multi-use rm w/ bathrm & wine cellar, excavate one foot more or less to have 8' ceiling, at unit 2 @ rear, relocate bathrm from 1st fl to 2nd fl, remodel (e)kitchen and (n)half bath, install plywood sheathing, steel bm & upgrade new foundation per | $65,000 |