Prime Home Builders Inc
- Based in
- San Jose
- On San Francisco permits
- Jun 2020 to Jul 2022
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2022 | Expired or cancelled cancelled Jan 2026 | 117 Diamond St | install 2 single doors, different sizes, glass window tempered. install one more sink. install new heat pump heater. revision to 202205134180, remove existing furnace.Details
install 2 single doors, different sizes, glass window tempered. install one more sink. install new heat pump heater. revision to 202205134180, remove existing furnace. | $5,000 |
| May 13, 2022 | Never finaled issued Jun 2022, no final | 117 Diamond St | partial wall. relocate 2 entry door. install 2 windows. demolition & hawling walls 2nd fl.Details
partial wall. relocate 2 entry door. install 2 windows. demolition & hawling walls 2nd fl. | $70,000 |
| Sep 20, 2021 | Completed final sign-off Jan 2022 | 1301 La Playa | unit 28: remodel 1 kitchen & 1 bathroom. like for like. replace ktichen cabinets, sink countertop, flooring. bathroom: tub, vanity, tile, toilet.Details
unit 28: remodel 1 kitchen & 1 bathroom. like for like. replace ktichen cabinets, sink countertop, flooring. bathroom: tub, vanity, tile, toilet. | $24,000 |
| Jun 26, 2020 | Completed final sign-off Nov 2020 | 117 Diamond St | interior tenant improvement @ the basement level. work includes (n) non-structural partitions, (1)(n) pre-k restroom, & (n) flooring @ area of work. scope of work also includes installation of (n) 48" high fence in yard.Details
interior tenant improvement @ the basement level. work includes (n) non-structural partitions, (1)(n) pre-k restroom, & (n) flooring @ area of work. scope of work also includes installation of (n) 48" high fence in yard. | $78,000 |