Prime Cut Construction
- Based in
- Brisbane
- On San Francisco permits
- Aug 2015 to Aug 2015
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2015 | Never finaled issued Aug 2015, no final | 976 Corbett Av | repair damage to rear of house, install new (repair) existing window - dry rot repair - install replacement deck 18" - 22" off of ground, as per existing deck.Details
repair damage to rear of house, install new (repair) existing window - dry rot repair - install replacement deck 18" - 22" off of ground, as per existing deck. | $18,000 |