Back to bathroom remodel contractors
Premiere Home Builders Inc
- Based in
- Santa Clara
- On San Francisco permits
- Feb 2016 to Jun 2016
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2016 | Completed final sign-off Nov 2016 | 355 Buena Vista East Av | unit #110: remodel kitchen and bathroom and install recess lights,paint and patch,connect to (e)duct hood (n)lighting comply with cec 150.0(k).Details
unit #110: remodel kitchen and bathroom and install recess lights,paint and patch,connect to (e)duct hood (n)lighting comply with cec 150.0(k). | $37,000 |
| Apr 20, 2016 | Completed final sign-off Aug 2016 | 1997 Eddy St | bathroom remodeling: demo tiles from walls and floors, toilet, vanity and haul away, install new tiles shower head and valve, toilet and vanity and 3 recessed lights.Details
bathroom remodeling: demo tiles from walls and floors, toilet, vanity and haul away, install new tiles shower head and valve, toilet and vanity and 3 recessed lights. | $18,000 |
| Feb 18, 2016 | Never finaled issued Feb 2016, no final | 415 Liberty St | bathroom remodeling - demo wall and floor tiles, toilet and vanity. install vanity, toilet, wall and floor tiles and painting, replace light fixtures, relocate washer and dryer to the other side of the wall.Details
bathroom remodeling - demo wall and floor tiles, toilet and vanity. install vanity, toilet, wall and floor tiles and painting, replace light fixtures, relocate washer and dryer to the other side of the wall. | $25,000 |