Premenko Construction
- Based in
- Pacifica
- On San Francisco permits
- Apr 2011 to Jan 2022
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 11, 2022 | Completed final sign-off Oct 2022 | 2955 03rd St | new accessible business entry barrier removal on the ground floor. addition of exterior disabled access ramp to front door. relocation of existing entry door no tother work is proposed.Details
new accessible business entry barrier removal on the ground floor. addition of exterior disabled access ramp to front door. relocation of existing entry door no tother work is proposed. | $15,000 |
| Jan 11, 2022 | Never finaled issued Apr 2022, no final | 2955 03rd St | rear bldg to comply with abe program ord 51-16 removal on the ground fl; addition of exterior disabled access ramp to front door; new landing and van parking space; addition of wireless doorbell to front counter @ interior landing. accessible repave route from sidewalk, transaction counter.Details
rear bldg to comply with abe program ord 51-16 removal on the ground fl; addition of exterior disabled access ramp to front door; new landing and van parking space; addition of wireless doorbell to front counter @ interior landing. accessible repave route from sidewalk, transaction counter. | $20,000 |
| Jan 3, 2020 | Completed final sign-off Jul 2020 | 301 Sussex St | replace wood shingle with stucco on back side of garage approxmately 600sq ft. replace 2 existing deteriorated window.Details
replace wood shingle with stucco on back side of garage approxmately 600sq ft. replace 2 existing deteriorated window. | $6,000 |
| Apr 20, 2016 | Completed final sign-off Aug 2016 | 2 Fallon Pl | rpairs to kitchen; electric water heater, counter, sink & faucet, g.d. and dishwasher. repair subflooring and tile flooring due to water damage. repair/replace existing cabinets as needed. include electrical, carpentry,painting and plumbing, etc.Details
rpairs to kitchen; electric water heater, counter, sink & faucet, g.d. and dishwasher. repair subflooring and tile flooring due to water damage. repair/replace existing cabinets as needed. include electrical, carpentry,painting and plumbing, etc. | $9,875 |
| Dec 2, 2013 | Completed final sign-off Dec 2013 | 73 Pretor Wy | replace furnace, water heater, repairs to walls, including electrical, gas, plumbing, sheetmetal, and wall & carpentry. relocae approx. 5 feet to wall.Details
replace furnace, water heater, repairs to walls, including electrical, gas, plumbing, sheetmetal, and wall & carpentry. relocae approx. 5 feet to wall. | $8,000 |
| Oct 27, 2011 | Completed final sign-off May 2012 | 1928 Mason St | repair/replace back stairs, risers, landing, etc. not to exceed 50%. al, paintsiding and replace any deteriorated siding and trim. repair in kind.Details
repair/replace back stairs, risers, landing, etc. not to exceed 50%. al, paintsiding and replace any deteriorated siding and trim. repair in kind. | $9,000 |
| Apr 15, 2011 | Completed final sign-off Jul 2012 | 122 Church St | water proofing exterior deck. remove tile - repair water proofing and replace with tile deck; relocate deck drain.Details
water proofing exterior deck. remove tile - repair water proofing and replace with tile deck; relocate deck drain. | $1,000 |