Preferred Power Solutions Inc

Contractor license
964882
State license record
Based in
Bakersfield
On San Francisco permits
Apr 2019 to Mar 2021
Last 24 months
0 permits filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Mar 18, 2021Completed
final sign-off Aug 2021
3350 Mission Stev: upgrade (e) ev dispensers. install (3) 175kw power gen units. remove & replace concrete pad as needed, same size. install (3) new dispensers with bollards. remove (e) unnecessary bollards. install light.
Details
Permit
202103186858
Status
complete
Filed
Mar 18, 2021
Permit issued
Jul 12, 2021
Final sign-off
Aug 12, 2021
Declared cost
$90,000
Address
3350 Mission St

ev: upgrade (e) ev dispensers. install (3) 175kw power gen units. remove & replace concrete pad as needed, same size. install (3) new dispensers with bollards. remove (e) unnecessary bollards. install light.

Open the permit page

$90,000
Apr 30, 2019Completed
final sign-off Apr 2020
1335 Webster Stinstall 1 utility transformer, 1 switchboard assembly, 3 (150kw) btc power units, 3 (150kw) btc dispensers, 1 level 2 charger
Details
Permit
201904309359
Status
complete
Filed
Apr 30, 2019
Permit issued
Jan 17, 2020
Final sign-off
Apr 29, 2020
Declared cost
$100,000
Address
1335 Webster St

install 1 utility transformer, 1 switchboard assembly, 3 (150kw) btc power units, 3 (150kw) btc dispensers, 1 level 2 charger

Open the permit page

$100,000