Precise Construction & Design/Dba Precis
- Based in
- Hayward
- On San Francisco permits
- Oct 2020 to Jan 2024
- Last 24 months
- 0 permits filed
4 permits since 2000: 1 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 579 days from filing to permit and 942 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2022 | Completed final sign-off May 2026 | 449 Pennsylvania Av | convert 1st floor to habitable spaces. extend existing first floor towards the rear. firsts floor will have two new bathrooms, a new study, new family room and new master bedroom. remodel second floor, raise roof three feet and build new deck at rear over first floor.Details
convert 1st floor to habitable spaces. extend existing first floor towards the rear. firsts floor will have two new bathrooms, a new study, new family room and new master bedroom. remodel second floor, raise roof three feet and build new deck at rear over first floor. | $49,999 |