Powerhouse Retail Services Llc
- Based in
- Crowley
- On San Francisco permits
- Jan 2018 to Nov 2025
- Last 24 months
- 1 permit filed
10 permits since 2000: 5 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2025 | In progress filed Nov 2025, not yet issued | 2690 Geary Bl | convert (e) retail space into office (regional office).Details
convert (e) retail space into office (regional office). | $180,000 |
| Nov 30, 2022 | Expired or cancelled withdrawn Jun 2023 | 221 Sansome St | coffee machine/appliance chance out for 7-eleven.Details
coffee machine/appliance chance out for 7-eleven. | $30,705 |
| Nov 30, 2022 | Expired or cancelled withdrawn Aug 2023 | 2650 Mason St | coffee machine/appliance chance out for 7-eleven.Details
coffee machine/appliance chance out for 7-eleven. | $30,705 |
| Nov 30, 2022 | Expired or cancelled withdrawn Sep 2023 | 527 Sutter St | coffee machine/appliance chance out for 7-eleven.Details
coffee machine/appliance chance out for 7-eleven. | $30,705 |
| Sep 22, 2022 | Completed final sign-off May 2023 | 701 Irving St | install replacement atm site improvements to create accesible landing for atm infill window in atm roomDetails
install replacement atm site improvements to create accesible landing for atm infill window in atm room | $95,000 |
| May 12, 2022 | Completed final sign-off Sep 2024 | 355 Bay Shore Bl | installation of a new walk up atm - demo/for/ our atm footing. provide and install bollards. run conduit and cable for electrical to house panel. provide and install lightins on buidling fasciaDetails
installation of a new walk up atm - demo/for/ our atm footing. provide and install bollards. run conduit and cable for electrical to house panel. provide and install lightins on buidling fascia | $55,000 |
| Aug 20, 2020 | Completed final sign-off Nov 2022 | 701 Irving St | barrior removal.Details
barrior removal. | $10,000 |
| Aug 8, 2020 | Completed final sign-off Mar 2022 | 444 Castro St | barrier removalDetails
barrier removal | $8,500 |
| Aug 5, 2020 | Completed final sign-off Jul 2021 | 1801 Van Ness Av | barrier removals. several door removals, bathroom modificationsDetails
barrier removals. several door removals, bathroom modifications | $11,500 |
| Jan 29, 2018 | Never finaled issued Jan 2018, no final | 1717 Harrison St | install drive way gates @ parking lot entries gates will not be solid closures - they will be open gates will measure in height 4', tube size will be 1-7/8" odDetails
install drive way gates @ parking lot entries gates will not be solid closures - they will be open gates will measure in height 4', tube size will be 1-7/8" od | $4,500 |