Power Builders Inc.
- Based in
- Montara
- On San Francisco permits
- Feb 2016 to May 2023
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2023 | Completed final sign-off Jul 2023 | 36 Woodland Av | dry rot repair of (e) exterior wall at rear yard replace skylight at roof all work to be done and finished in kind with (e) no alterations (north wall of breakfast area)Details
dry rot repair of (e) exterior wall at rear yard replace skylight at roof all work to be done and finished in kind with (e) no alterations (north wall of breakfast area) | $20,000 |
| Oct 4, 2022 | Completed final sign-off Sep 2023 | 23 Mallorca Wy | replace front 11 windows with sierra pacific wood windows wood interior and wood exterior, all windows with colonial 7/8 sdl, all windows replacement same size same location. replace 12 back windows with wood clad winodws fierce pacific product.Details
replace front 11 windows with sierra pacific wood windows wood interior and wood exterior, all windows with colonial 7/8 sdl, all windows replacement same size same location. replace 12 back windows with wood clad winodws fierce pacific product. | $45,000 |
| Feb 7, 2019 | Completed final sign-off Jun 2019 | 169 Pfeiffer St | revision to app#201808096882 as bubbled on plans to make door opening in wall. n/a for maherDetails
revision to app#201808096882 as bubbled on plans to make door opening in wall. n/a for maher | |
| Aug 9, 2018 | Completed final sign-off Jun 2019 | 169 Pfeiffer St | voluntary lateral upgrade of ground floor strengthening of existing foundation. n/a for maher.Details
voluntary lateral upgrade of ground floor strengthening of existing foundation. n/a for maher. | $35,000 |
| Mar 22, 2018 | Completed final sign-off Jan 2020 | 1298 Shotwell St | replace windows @ 1298 shotwell st with casement wood alum clad windows. maher n/aDetails
replace windows @ 1298 shotwell st with casement wood alum clad windows. maher n/a | $45,000 |
| Sep 7, 2017 | Expired or cancelled expired Mar 2023 | 2119 22nd St | comply with nov 201773982 replace west property line retaining wall via temporary cribbing shoring system. new basement foundationDetails
comply with nov 201773982 replace west property line retaining wall via temporary cribbing shoring system. new basement foundation | $100,000 |
| Apr 17, 2017 | Completed final sign-off Apr 2017 | 1235 Connecticut St | revision (construction phase change) to work underway per pa #201701046486 & 201703201828: revise configuration of non-load bearing partition. clarify no requirement for supplemental permit submittals. n/a maher ordinanceDetails
revision (construction phase change) to work underway per pa #201701046486 & 201703201828: revise configuration of non-load bearing partition. clarify no requirement for supplemental permit submittals. n/a maher ordinance | |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 1235 Connecticut St | revision to pa#201701046486: construction phase changes to original work. revis configuration of non-load bearing partition at entrace to room 101.Details
revision to pa#201701046486: construction phase changes to original work. revis configuration of non-load bearing partition at entrace to room 101. | |
| Nov 22, 2016 | Completed final sign-off Sep 2019 | 3730 25th St | soft story retrofit to comply with sfbc ch 34b based on iebc appendix a-4 & calculationsDetails
soft story retrofit to comply with sfbc ch 34b based on iebc appendix a-4 & calculations | $120,000 |
| Feb 16, 2016 | Completed final sign-off May 2016 | 21 Mallorca Wy | demo & replace 2 story deck at back of bldg. replace extg garage door with like kind to match.Details
demo & replace 2 story deck at back of bldg. replace extg garage door with like kind to match. | $8,000 |