Port Costa Builders
- Based in
- Port Costa
- On San Francisco permits
- May 2010 to Oct 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 147 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2012 | Completed final sign-off Nov 2013 | 65 Beaver St | reconfigure deck/rear stairs @ rear wall. (reconfig doors & windows number at same location.) install outdoor lighting per 2010 energy codes.Details
reconfigure deck/rear stairs @ rear wall. (reconfig doors & windows number at same location.) install outdoor lighting per 2010 energy codes. | $10,000 |