Back to bathroom remodel contractors
Pn Construction
- Based in
- El Sobrante
- On San Francisco permits
- Apr 2009 to Feb 2022
- Last 24 months
- 0 permits filed
26 permits since 2000: 19 completed, 7 never finaled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 2 never finaled. Typically 56 days from filing to permit and 432 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2022 | Never finaled issued May 2022, no final | 29 Forest Knolls Dr | reconfigure interior stair to code. enclose portion of (e) garage for nw bedroom. @ grade (e) bathrm, add shower @ g/f. add nw exterior egress window @ nw g/fl bedroom wall. widen stair @ 2/f & move interior bathroom wall, sink & toilet. no other work @ 2/f. no exterior work beyond add of new rearDetails
reconfigure interior stair to code. enclose portion of (e) garage for nw bedroom. @ grade (e) bathrm, add shower @ g/f. add nw exterior egress window @ nw g/fl bedroom wall. widen stair @ 2/f & move interior bathroom wall, sink & toilet. no other work @ 2/f. no exterior work beyond add of new rear | $45,000 |
| Oct 5, 2017 | Completed final sign-off Dec 2019 | 1719 Green St | remodel of (e) 3story building including horizontal expansion @ side & rear yard. addition of 1 dormer & skylights & addition of 1 bathroom & 1 bedroom.Details
remodel of (e) 3story building including horizontal expansion @ side & rear yard. addition of 1 dormer & skylights & addition of 1 bathroom & 1 bedroom. | $285,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2018 | 227 Gates St | 1st floor: reconfigure extg bedroom/bathroom space & stair. 2nd floor: relocate kitchen & bedrooms, reconfigure stair. front: exterior work: replacement garage doors, windows. rear: new cantilevered deck off of 2nd fl.ground fl. replacement deck. nw windows & doors.Details
1st floor: reconfigure extg bedroom/bathroom space & stair. 2nd floor: relocate kitchen & bedrooms, reconfigure stair. front: exterior work: replacement garage doors, windows. rear: new cantilevered deck off of 2nd fl.ground fl. replacement deck. nw windows & doors. | $175,000 |
| Feb 28, 2017 | Completed final sign-off Nov 2017 | 87 Seal Rock Dr | add living space to e storage area at gr fl. new living rm, bedroom, office, bath, laundry. new openings to rear yard, new decks, landscaping in rear yardDetails
add living space to e storage area at gr fl. new living rm, bedroom, office, bath, laundry. new openings to rear yard, new decks, landscaping in rear yard | $75,000 |
| Sep 21, 2016 | Completed final sign-off Jan 2018 | 240 05th Av | 1st floor: reconfigure entry area. 2nd floor: relocate kitchen, reconfigure bathrooms, add bedroom, bathroom and laundryDetails
1st floor: reconfigure entry area. 2nd floor: relocate kitchen, reconfigure bathrooms, add bedroom, bathroom and laundry | $75,000 |
| Oct 13, 2015 | Completed final sign-off Jul 2016 | 1053 Clayton St | restoration of fire damage: framing, siding, kitchens, and bathrooms. repair in kind interior wall demo less than 75%.Details
restoration of fire damage: framing, siding, kitchens, and bathrooms. repair in kind interior wall demo less than 75%. | $250,000 |
| Jul 16, 2014 | Never finaled issued Jul 2014, no final | 280 Tocoloma Av | structural reinforcement of garage. remodel existing kitchen and (e) bathroom on 2nd floor. repair plumbing.Details
structural reinforcement of garage. remodel existing kitchen and (e) bathroom on 2nd floor. repair plumbing. | $35,000 |
| Apr 21, 2009 | Completed final sign-off Feb 2012 | 164 Jordan Av | remodeling kitchen and family room on 1st floor and relocating powder room. removing chimney. bldg garage attached on south side. remodeling bedroom and bath on 2nd. relocating master suite to rear and developing attic space for future use.Details
remodeling kitchen and family room on 1st floor and relocating powder room. removing chimney. bldg garage attached on south side. remodeling bedroom and bath on 2nd. relocating master suite to rear and developing attic space for future use. | $240,000 |