Back to bathroom remodel contractors
Pmk Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Aug 2011
- Last 24 months
- 0 permits filed
14 permits since 2000: 10 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2011 | Completed final sign-off Sep 2011 | 1316 06th Av | remodel (e) bathroom in (e) location, no structural work. new lighting shall be efficacy unless controlled by manual or occupancy sensorDetails
remodel (e) bathroom in (e) location, no structural work. new lighting shall be efficacy unless controlled by manual or occupancy sensor | $9,000 |
| May 31, 2011 | Completed final sign-off Feb 2012 | 1316 Guerrero St | interior remodel of 1st & 2nd floors, replace windows @ rear facade and some on side elevations(not visible from street). work includes new walls,finishes and cabinetry. (n) rear yard deck @ 1st floor. m.e.p to be serperate permits. relocate (e) kit & create 1 new bedroom & 1 new bath at both units.Details
interior remodel of 1st & 2nd floors, replace windows @ rear facade and some on side elevations(not visible from street). work includes new walls,finishes and cabinetry. (n) rear yard deck @ 1st floor. m.e.p to be serperate permits. relocate (e) kit & create 1 new bedroom & 1 new bath at both units. | $90,000 |
| Jan 25, 2011 | Expired or cancelled expired Aug 2015 | 2226 California St | remodel existing bathroom in existing location. no structural. all in unit 201Details
remodel existing bathroom in existing location. no structural. all in unit 201 | $5,000 |
| Jun 8, 2010 | Completed final sign-off Jun 2012 | 358 Utah St | (e) laundry "porch" into full bath 3' door widened to 8'-0" opening. double window changed to french doors. (e) patio replaced with wood suface deck.Details
(e) laundry "porch" into full bath 3' door widened to 8'-0" opening. double window changed to french doors. (e) patio replaced with wood suface deck. | $21,350 |
| Dec 15, 2009 | Never finaled issued Aug 2010, no final | 1 Aladdin Tr | work only on unit#1 aladdin ter. interior & exterior remodel to 4th. flr. of (e) 2-unit bldg. scope of work is limited to; demolition & const. of interior & exterior partitions. remodel & horiz. expansion to an (e) master bathroom, master bedroom & utility room.Details
work only on unit#1 aladdin ter. interior & exterior remodel to 4th. flr. of (e) 2-unit bldg. scope of work is limited to; demolition & const. of interior & exterior partitions. remodel & horiz. expansion to an (e) master bathroom, master bedroom & utility room. | $30,000 |