Back to bathroom remodel contractors
Plus One Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Feb 2022 to Aug 2026
- Last 24 months
- 9 permits filed
15 permits since 2000: 8 completed, 5 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
10 bathroom remodel permits: 4 completed, 4 in progress, 2 never finaled. Typically 26 days from filing to permit and 226 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Aug 2026 | 1380 Greenwich St | unit #205: demo existing toilet; bathtub: tiles; vanity; install new toilet and vanity; build new shower with glass door; full bathroom repaint, replace exhaust fan. (all in 2nd floor) (40sf)Details
unit #205: demo existing toilet; bathtub: tiles; vanity; install new toilet and vanity; build new shower with glass door; full bathroom repaint, replace exhaust fan. (all in 2nd floor) (40sf) | $20,000 |
| Jul 13, 2026 | In progress issued Aug 2026 | 715 Ulloa St | construct new bathroom, remodel (e) bathroom at 3/f. remodel (e) kitchen, (e) bathroom at 2/f. remove walls between kitchen, nook, & bedroom closet @ 2/f. replace (e) window at nook due to dryrot at 2/f. install (n) heat pump furnace. install (n) tankless gas water heater.Details
construct new bathroom, remodel (e) bathroom at 3/f. remodel (e) kitchen, (e) bathroom at 2/f. remove walls between kitchen, nook, & bedroom closet @ 2/f. replace (e) window at nook due to dryrot at 2/f. install (n) heat pump furnace. install (n) tankless gas water heater. | $120,000 |
| Jul 16, 2025 | Completed final sign-off Aug 2025 | 1622 30th Av | gut out full bath. relocate sink location, new plumbing fixture (showers, drain, vanity, replace exhaust fan & new light, provide gfci per code, no remove wall, new tiles & shower pan.Details
gut out full bath. relocate sink location, new plumbing fixture (showers, drain, vanity, replace exhaust fan & new light, provide gfci per code, no remove wall, new tiles & shower pan. | $20,000 |
| Apr 10, 2025 | Completed final sign-off Aug 2026 | 175 Rey St | remodel of kitchen and bathroom. addition of one bathroom. upgrade of all electrical wires at second floor.Details
remodel of kitchen and bathroom. addition of one bathroom. upgrade of all electrical wires at second floor. | $50,000 |
| Oct 10, 2024 | In progress issued Oct 2024 | 2038 Powell St | renovation of existing 2 family dwelling. no expasion, 1 bath to be added, minor reconfiguration of walls and doors. remodel 2 kitchens and 3 bathroomsDetails
renovation of existing 2 family dwelling. no expasion, 1 bath to be added, minor reconfiguration of walls and doors. remodel 2 kitchens and 3 bathrooms | $100,000 |
| Oct 11, 2023 | In progress filed Oct 2023, not yet issued | 200 Brannan St | unit #107: bathroom remodel - convert tub into shower, install new fixtures. no location change. install new tiles and paint. kitchen remodel - install new kitchen cabinet with same layout. install new plumbing fixtures and upgrade countertop. electrical by code.Details
unit #107: bathroom remodel - convert tub into shower, install new fixtures. no location change. install new tiles and paint. kitchen remodel - install new kitchen cabinet with same layout. install new plumbing fixtures and upgrade countertop. electrical by code. | $25,000 |
| Oct 12, 2022 | Never finaled issued Apr 2023, no final | 2823 Laguna St | 3rd fl: convert (e) living room and (e) bathroom to (n) primary bedroom and bathroom. remove (e) bedroom for (n) office 52 sf.Details
3rd fl: convert (e) living room and (e) bathroom to (n) primary bedroom and bathroom. remove (e) bedroom for (n) office 52 sf. | $15,000 |
| Jun 15, 2022 | Completed final sign-off Aug 2022 | 44 Lagunitas Dr | renovation of 2/f bathroom and closet. addition of new bathroom, sinks and toilet, new closets in primary bedroom. (n) window at second bathroom, reduce window size in primary bathroom. windows not visible from street.Details
renovation of 2/f bathroom and closet. addition of new bathroom, sinks and toilet, new closets in primary bedroom. (n) window at second bathroom, reduce window size in primary bathroom. windows not visible from street. | $80,000 |
| Apr 15, 2022 | Never finaled issued Aug 2022, no final | 1650 Noriega St | remodel extg dental office, no change of use, no fixture count change. relocate ada bathroom per plan, repair dryrot less than 50% work only to be performed on dental office only.Details
remodel extg dental office, no change of use, no fixture count change. relocate ada bathroom per plan, repair dryrot less than 50% work only to be performed on dental office only. | $50,000 |
| Feb 25, 2022 | Completed final sign-off Apr 2023 | 751 38th Av | 1/f: add 1 bedroom, family and 1.5 bath. 2/f: remodel kitchen, bathroom, add 1 full bathrom, add new deck, replace garage door. replace all front windows with in-kind (alum clad wood).Details
1/f: add 1 bedroom, family and 1.5 bath. 2/f: remodel kitchen, bathroom, add 1 full bathrom, add new deck, replace garage door. replace all front windows with in-kind (alum clad wood). | $70,000 |