Back to bathroom remodel contractors
Plus General Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2010 to May 2023
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 6 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2015 | Completed final sign-off Nov 2020 | 1615 Wallace Av | two story additin at the rear of bldg. add 2 bedroom, 1 bathroom, and a playroom at ground flr.Details
two story additin at the rear of bldg. add 2 bedroom, 1 bathroom, and a playroom at ground flr. | $110,000 |
| Oct 31, 2013 | Completed final sign-off Apr 2014 | 850 38th Av | alteration to gr lvl, add 680 sq ft living space: 2 full baths, 1 living rm,1 playrm, 1 study rm, 1 library. replace 1 existing window and instal 2 new windows. relocate furnace, water heater, dryer, washer.Details
alteration to gr lvl, add 680 sq ft living space: 2 full baths, 1 living rm,1 playrm, 1 study rm, 1 library. replace 1 existing window and instal 2 new windows. relocate furnace, water heater, dryer, washer. | $84,500 |
| Oct 15, 2013 | Completed final sign-off Jan 2014 | 430 Bright St | remodel kitchen, bathroom. update electrical system. repair sheetrock in kind/ 5/8 type x in basement family room.Details
remodel kitchen, bathroom. update electrical system. repair sheetrock in kind/ 5/8 type x in basement family room. | $20,000 |
| Jan 31, 2012 | Completed final sign-off Jun 2012 | 1638 Palou Av | comply w/nov #201279556 - remove illegal kitchen @ ground floor, legalize partition wall @ (e) home office, install (n) laundry & remodel (e) bathroom @ ground floor.Details
comply w/nov #201279556 - remove illegal kitchen @ ground floor, legalize partition wall @ (e) home office, install (n) laundry & remodel (e) bathroom @ ground floor. | $6,000 |
| Aug 9, 2010 | Completed final sign-off Dec 2010 | 25 Italy Av | remodel 2 bathrooms on 2/f, electrical service, 100 amp. water service to copper pipe, no structural work, no new lighting.Details
remodel 2 bathrooms on 2/f, electrical service, 100 amp. water service to copper pipe, no structural work, no new lighting. | $6,000 |