Plane & Level

Contractor license
845925
State license record
Based in
Sebastopol
On San Francisco permits
Aug 2017 to Feb 2018
Last 24 months
0 permits filed

3 permits since 2000: 2 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllStairs 1Kitchen remodel 1Bathroom remodel 2

2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 83 days from filing to permit and 473 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 13, 2018Never finaled
issued Feb 2018, no final
410 Vienna Stconvert existing workshop space at basement level into living space, 1 bedroom, 1 full bath, with new interior stair connection to replace existing exterior stair. total addition of living space 343 sq ft
Details
Permit
201802131186
Status
issued
Filed
Feb 13, 2018
Permit issued
Feb 15, 2018
Declared cost
$35,000
Address
410 Vienna St

convert existing workshop space at basement level into living space, 1 bedroom, 1 full bath, with new interior stair connection to replace existing exterior stair. total addition of living space 343 sq ft

Open the permit page

$35,000
Nov 14, 2017Completed
final sign-off Aug 2019
54 Mullen Avlegalize as-built unit on 1st floor per unit legalization ordinance# 43-14. one studio & one bath on 1st floor per plan.
Details
Permit
201711143924
Status
complete
Filed
Nov 14, 2017
Permit issued
Apr 27, 2018
Final sign-off
Aug 13, 2019
Address
54 Mullen Av

legalize as-built unit on 1st floor per unit legalization ordinance# 43-14. one studio & one bath on 1st floor per plan.

Open the permit page