Back to bathroom remodel contractors
Pkm Builders Inc
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2013 to Jul 2019
- Last 24 months
- 0 permits filed
54 permits since 2000: 35 completed, 14 never finaled, 5 expired or cancelled.
Of the 14 never-finaled permits, 5 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 14 completed, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 142 Bennington St | remodle kitchen (130 sq ft) and rear bathroom (40sq ft) in kind. replace 5 windows, upgrade electrical main meter. work not visible from street.Details
remodle kitchen (130 sq ft) and rear bathroom (40sq ft) in kind. replace 5 windows, upgrade electrical main meter. work not visible from street. | $25,000 |
| Jul 22, 2019 | Completed final sign-off Mar 2020 | 726 Shrader St | upgrade bathroom with new eletric, cab, sheetrock, insulation, new shower and new plumbing for toilet and sink. in kind bathroom remodelDetails
upgrade bathroom with new eletric, cab, sheetrock, insulation, new shower and new plumbing for toilet and sink. in kind bathroom remodel | $9,000 |
| May 3, 2019 | Completed final sign-off Feb 2022 | 288 Union St | unti 1: kitchen and bathroom remodel. kitchen: 128 sqft. bathroom: 84 sqft. kitchen: demo amd replace all cabinets. replace electrical range to gas. add (4) outlets. replace sink and faucet. bathroom: demolish bathtub and replace with shower only. new shower pan.Details
unti 1: kitchen and bathroom remodel. kitchen: 128 sqft. bathroom: 84 sqft. kitchen: demo amd replace all cabinets. replace electrical range to gas. add (4) outlets. replace sink and faucet. bathroom: demolish bathtub and replace with shower only. new shower pan. | $15,000 |
| Feb 5, 2019 | Completed final sign-off Apr 2019 | 1150 Lombard St | insulate walls and ceiling in bathroom. install new sheetrock, door casings, new couter tops, prime and paint. approx 150 sq ft of wall and ceiling. no moving of walls or structureDetails
insulate walls and ceiling in bathroom. install new sheetrock, door casings, new couter tops, prime and paint. approx 150 sq ft of wall and ceiling. no moving of walls or structure | $8,000 |
| Aug 13, 2018 | Completed final sign-off Feb 2022 | 288 Union St | remove and replace kitchen cabinets in apartment 2 and 3; (10'x12'each)remove and replace bathroom tile in apartment 2 and 3. (total of two bathroom 5'x8') interior and exterior repainting. no other interior or exterior work per this permit.Details
remove and replace kitchen cabinets in apartment 2 and 3; (10'x12'each)remove and replace bathroom tile in apartment 2 and 3. (total of two bathroom 5'x8') interior and exterior repainting. no other interior or exterior work per this permit. | $18,000 |
| Jun 19, 2018 | Completed final sign-off Jan 2019 | 730 Shrader St | remodel kitchen and bathroom in kindDetails
remodel kitchen and bathroom in kind | $10,000 |
| May 21, 2018 | Completed final sign-off Sep 2019 | 2663 18th Av | remodel 2nd floor bathroom in-kind, new plumbing & electrical. no change of floor plan.Details
remodel 2nd floor bathroom in-kind, new plumbing & electrical. no change of floor plan. | $20,000 |
| Dec 22, 2017 | Never finaled issued Dec 2017, no final | 1043 York St | remodel entire apt: new electrical, lumbing, sheetrock, paint,,flooring to comply with complaint 201719728; 5/8in type x sheet rock throughout. remodel 1 bathroom 1 kitchen ; no changes to framing.Details
remodel entire apt: new electrical, lumbing, sheetrock, paint,,flooring to comply with complaint 201719728; 5/8in type x sheet rock throughout. remodel 1 bathroom 1 kitchen ; no changes to framing. | $25,000 |
| Nov 22, 2017 | Completed final sign-off Feb 2019 | 619 Naples St | remodel of (e) kitchen, remodel of (e) bathroom on 2nd. addition of 2 new bedrooms on 1st flr. addition of 2 new bathrooms on 1st lfr.Details
remodel of (e) kitchen, remodel of (e) bathroom on 2nd. addition of 2 new bedrooms on 1st flr. addition of 2 new bathrooms on 1st lfr. | $80,000 |
| Sep 26, 2017 | Completed final sign-off Mar 2018 | 371 Broadway | #46- remodel bathroom in kind, 1 toilet, 1 sink, 1 tub, 1 new circuit.Details
#46- remodel bathroom in kind, 1 toilet, 1 sink, 1 tub, 1 new circuit. | $10,000 |
| May 19, 2017 | Completed final sign-off Jul 2017 | 768 Church St | remodel (e) bathroom & electrical upgrade.Details
remodel (e) bathroom & electrical upgrade. | $19,000 |
| Nov 17, 2015 | Never finaled issued Nov 2015, no final | 917 Treat Av | change w/c to a full bathroom updates permit #201509036106. no walls removed.Details
change w/c to a full bathroom updates permit #201509036106. no walls removed. | |
| Sep 3, 2015 | Completed final sign-off Aug 2017 | 917 Treat Av | remodel kitchen, bathroom & water closet in-kind. no walls to be altered or removed.Details
remodel kitchen, bathroom & water closet in-kind. no walls to be altered or removed. | $30,000 |
| Dec 19, 2014 | Expired or cancelled expired Jul 2019 | 1423 Valencia St | expand (e) office to existing auto body shop. (e) entry to body shop provide new powder operator, new unisex bathroom, provide new accessible counter and 1 hour wall btw office and (e) auto body shop.Details
expand (e) office to existing auto body shop. (e) entry to body shop provide new powder operator, new unisex bathroom, provide new accessible counter and 1 hour wall btw office and (e) auto body shop. | $30,000 |
| Oct 20, 2014 | Completed final sign-off Dec 2014 | 768 Church St | #5:bathroom remodel - bathtub replacement, sink, toilet, upgrade electrical panel and separate circuit for bathroom fan installation. no walls moved, removed or added. all fixture layout to remain unchangedDetails
#5:bathroom remodel - bathtub replacement, sink, toilet, upgrade electrical panel and separate circuit for bathroom fan installation. no walls moved, removed or added. all fixture layout to remain unchanged | $13,000 |
| Oct 20, 2014 | Completed final sign-off Dec 2014 | 768 Church St | bathroom remodel, bathtub replacement, sink, toilet, upgrade panel electrical, fan installation. no walls removed, moved or added. all fixture layouts to remain unchangedDetails
bathroom remodel, bathtub replacement, sink, toilet, upgrade panel electrical, fan installation. no walls removed, moved or added. all fixture layouts to remain unchanged | $13,000 |
| Aug 29, 2014 | Never finaled issued Aug 2014, no final | 1517 Waller St | plaster and replaced with sheetrock min 5/8" type x. demo and remodel complete unit new electrical and plumbing. 1 bathroom - 1 kitchen. no walls to be removed.Details
plaster and replaced with sheetrock min 5/8" type x. demo and remodel complete unit new electrical and plumbing. 1 bathroom - 1 kitchen. no walls to be removed. | $35,000 |
| May 16, 2014 | Never finaled issued May 2014, no final | 1517 Waller St | remodel unit 2. 1 kitchen, 1 bath, new electrical, plumbing, in uit. all sheetrock replaced. new sub panel and main serviceDetails
remodel unit 2. 1 kitchen, 1 bath, new electrical, plumbing, in uit. all sheetrock replaced. new sub panel and main service | $35,000 |
| Apr 17, 2014 | Completed final sign-off Feb 2015 | 1870 33rd Av | kitchen and bath remodel, remove 36" pony wall. comply with nov 201464961Details
kitchen and bath remodel, remove 36" pony wall. comply with nov 201464961 | $25,000 |
| Mar 6, 2014 | Completed final sign-off Jul 2014 | 501 Grove St | kitchen lights, min 50% high eff for 50% of wattage bathroom lights high efficacy unless controlled by manual on occupancy sensorsDetails
kitchen lights, min 50% high eff for 50% of wattage bathroom lights high efficacy unless controlled by manual on occupancy sensors | $38,000 |