Back to bathroom remodel contractors
Pioneer Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Aug 2024
- Last 24 months
- 0 permits filed
188 permits since 2000: 135 completed, 1 in progress, 19 never finaled, 33 expired or cancelled.
Of the 19 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 10 completed, 2 never finaled, 3 expired or cancelled. Typically 3 days from filing to permit and 397 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 23, 2020 | Never finaled issued Jan 2021, no final | 219 Brannan St | #17k: remodel kitchen and 2 bathrooms. new door and soffit, lighting and outlets. replace flooring.Details
#17k: remodel kitchen and 2 bathrooms. new door and soffit, lighting and outlets. replace flooring. | $21,000 |
| Oct 30, 2020 | Completed final sign-off Apr 2022 | 663 44th Av | remodel to the (e) bathroom, w.c. & kitchyen of a single family home. no exterior work, all (e) windows to remain new cabinets, new lighting, new fixtures new finishes.Details
remodel to the (e) bathroom, w.c. & kitchyen of a single family home. no exterior work, all (e) windows to remain new cabinets, new lighting, new fixtures new finishes. | $75,000 |
| Mar 29, 2019 | Completed final sign-off Apr 2019 | 2205 Taylor St | remodel ground floor. remodel of kitchen. relocate bathroom and convert from 1/2 bath to full bathDetails
remodel ground floor. remodel of kitchen. relocate bathroom and convert from 1/2 bath to full bath | $50,000 |
| Mar 23, 2018 | Never finaled issued Mar 2018, no final | 2518 Union St | laundry rm - replace w/d, flooring, sink, cabinets. mud rm - install stackable unit, lighting, flooring. powder rm - replace sink and flooring. 3 small bathrooms - flooring tiles only. window infill at laundry rm under sep permitDetails
laundry rm - replace w/d, flooring, sink, cabinets. mud rm - install stackable unit, lighting, flooring. powder rm - replace sink and flooring. 3 small bathrooms - flooring tiles only. window infill at laundry rm under sep permit | $70,000 |
| Jun 9, 2017 | Completed final sign-off Oct 2019 | 669 44th Av | revision to pa #201705247547 - interior remodel within existing bldg & limited structural work. replacement of exterior door & windows at rear. add 1 new bathroom at top floor. no changes to facade.Details
revision to pa #201705247547 - interior remodel within existing bldg & limited structural work. replacement of exterior door & windows at rear. add 1 new bathroom at top floor. no changes to facade. | $230,000 |
| May 24, 2017 | Expired or cancelled expired Oct 2019 | 669 44th Av | install new kitchen cagbinets and tile. install new tile and fixtures in 2 bathrooms install new gas furancing and ducting. no change on walls.Details
install new kitchen cagbinets and tile. install new tile and fixtures in 2 bathrooms install new gas furancing and ducting. no change on walls. | $15,000 |
| Jan 10, 2017 | Expired or cancelled cancelled Aug 2018 | 333 Linden St | new facade work including new windows & doors, remvoe (e) stucco & install new materials per elevation, remove (e) fire escape, construct 2 new accessible bathrooms.Details
new facade work including new windows & doors, remvoe (e) stucco & install new materials per elevation, remove (e) fire escape, construct 2 new accessible bathrooms. | $80,000 |
| Apr 22, 2015 | Completed final sign-off Dec 2015 | 1847 Grant Av | unit #1: all proposed work within first floor, remodel kitchen & bathroom & install lighting throughout unit.replace (e) alum windows with new insulated alum windows to match style. install new washer & dryer at closet location.Details
unit #1: all proposed work within first floor, remodel kitchen & bathroom & install lighting throughout unit.replace (e) alum windows with new insulated alum windows to match style. install new washer & dryer at closet location. | $75,000 |
| Nov 25, 2014 | Completed final sign-off Sep 2016 | 2615 18th Av | remodel kitchen & bathroom. install new cabinets & countertops. update electrical. replace plumbing fixts. install new tile & flooring.Details
remodel kitchen & bathroom. install new cabinets & countertops. update electrical. replace plumbing fixts. install new tile & flooring. | $35,000 |
| Jun 3, 2014 | Completed final sign-off Feb 2015 | 201 Buchanan St | renovate (e) bathroom on main floor in 201 buchananDetails
renovate (e) bathroom on main floor in 201 buchanan | $28,000 |
| Apr 29, 2011 | Completed final sign-off Oct 2012 | 2005 Green St | remodel of existing ground floor dwelling unit, relocate kitchen & remodel bath. voluntary lateral strengthening of ground floor, new radiant heating system & floor slab, new lighting. remove & replace wood siding at ground floor front for seismic - in kind.Details
remodel of existing ground floor dwelling unit, relocate kitchen & remodel bath. voluntary lateral strengthening of ground floor, new radiant heating system & floor slab, new lighting. remove & replace wood siding at ground floor front for seismic - in kind. | $135,000 |
| Dec 24, 2009 | Completed final sign-off Oct 2010 | 1451 25th Av | remodel exisitng 2nd floor master bath & partial study remodel. no new fixture units added. expand around 20 s.f. into existing attic fo rtub/shower.2 new skylights.Details
remodel exisitng 2nd floor master bath & partial study remodel. no new fixture units added. expand around 20 s.f. into existing attic fo rtub/shower.2 new skylights. | $12,920 |
| Feb 25, 2008 | Completed final sign-off May 2008 | 2480 Bush St | remodel bathroom, remove and install a pocket door in the bathroom at nonbearing wall w/new 4"x8" header.Details
remodel bathroom, remove and install a pocket door in the bathroom at nonbearing wall w/new 4"x8" header. | $10,000 |
| Feb 5, 2008 | Completed final sign-off Dec 2013 | 143 Park St | revision to pa#2007/04/05/8159 to reduce the size of rear deck, add new spiral stair case, construct new retaining wall under the the deck at the rear, re-configure full bath and relocate the mechanical room on the ground floor. construct moment frame at the garage door.Details
revision to pa#2007/04/05/8159 to reduce the size of rear deck, add new spiral stair case, construct new retaining wall under the the deck at the rear, re-configure full bath and relocate the mechanical room on the ground floor. construct moment frame at the garage door. | $15,000 |
| Feb 8, 2005 | Expired or cancelled expired Jan 2006 | 5044 Geary Bl | minor partition to relocate hc bathroom & build a laundry room to appl#200306227585Details
minor partition to relocate hc bathroom & build a laundry room to appl#200306227585 | $1,200 |