Back to bathroom remodel contractors
Pieretti Construction Co
- Based in
- S San Francisco
- On San Francisco permits
- Oct 2008 to Apr 2011
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2011 | Completed final sign-off Aug 2011 | 845 Peru Av | repair (e) decking & railing in kind, original deck permitted under pa# 210802 (1960). new bathroom at garage levelDetails
repair (e) decking & railing in kind, original deck permitted under pa# 210802 (1960). new bathroom at garage level | $8,000 |
| Apr 29, 2009 | Completed final sign-off Sep 2009 | 24 Knollview Wy | rebuild bathroom at ground floor; replace all fixtures; move non-load bearing wall; rebuild shower pan; legalize room downstairsDetails
rebuild bathroom at ground floor; replace all fixtures; move non-load bearing wall; rebuild shower pan; legalize room downstairs | $7,500 |
| Dec 18, 2008 | Completed final sign-off Apr 2009 | 24 Knollview Wy | revise pa# 2008/10/02/3235 to include 2nd floor bathroom due to leaking shower pan. remove & replace all (e) fixtures in same locations (all non structure) replace shower pan, tube, vanity, toilet. new sheetrock green & white, r-13+ r-30 insulation, re-tile shower walls & floors. bathroom floor,Details
revise pa# 2008/10/02/3235 to include 2nd floor bathroom due to leaking shower pan. remove & replace all (e) fixtures in same locations (all non structure) replace shower pan, tube, vanity, toilet. new sheetrock green & white, r-13+ r-30 insulation, re-tile shower walls & floors. bathroom floor, | $11,000 |