Phollies Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2026
- Last 24 months
- 2 permits filed
178 permits since 2000: 149 completed, 3 in progress, 10 never finaled, 16 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 6 completed, 1 in progress. Typically 25 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2025 | In progress issued Mar 2025 | 671 28th St | interior remodel within (e) building includes limited structural work. 1st fl - addtion of entry vestibule with (n) floor elevations & enclosed space; 2nd fl - infill of (e) lightwells; (n) skylights and kitchen/bath remodel. demo and replace deck.Details
interior remodel within (e) building includes limited structural work. 1st fl - addtion of entry vestibule with (n) floor elevations & enclosed space; 2nd fl - infill of (e) lightwells; (n) skylights and kitchen/bath remodel. demo and replace deck. | $400,000 |
| Jun 29, 2016 | Completed final sign-off Dec 2019 | 848 35th Av | build out at rear of dwelling, 1st & 2nd floor at side yard both sides. 1st floor at rear yard under existing deck, add one bathroom laundry room, family roomDetails
build out at rear of dwelling, 1st & 2nd floor at side yard both sides. 1st floor at rear yard under existing deck, add one bathroom laundry room, family room | $400,000 |
| Dec 23, 2010 | Completed final sign-off Jan 2013 | 3141 Folsom St | the scope of work at the second and third floors involves the creation of a horizontal extension into the rear yard to accomodale a new master bath and deck.Details
the scope of work at the second and third floors involves the creation of a horizontal extension into the rear yard to accomodale a new master bath and deck. | $47,900 |
| Mar 9, 2007 | Completed final sign-off Aug 2007 | 870 Elizabeth St | replace (e) deck & stairs in kind and in same location & configuration with new pressure treated framing & suitable decking. roof deck, hardi-siding at rear elevation.Details
replace (e) deck & stairs in kind and in same location & configuration with new pressure treated framing & suitable decking. roof deck, hardi-siding at rear elevation. | $10,000 |
| Oct 16, 2003 | Completed final sign-off Apr 2005 | 161 Fairmount St | rear addition @ lst fl w/ kitchen, study, rear deck & interior stair.Details
rear addition @ lst fl w/ kitchen, study, rear deck & interior stair. | $30,000 |
| Nov 7, 2002 | Completed final sign-off Jan 2003 | 96 Jersey St | rev. appl#200210027996 rebuild (e) deck w/pressure treated materialsDetails
rev. appl#200210027996 rebuild (e) deck w/pressure treated materials | $2,200 |
| Oct 2, 2002 | Completed final sign-off Jan 2003 | 96 Jersey St | comply with nov 200231591 as per matt green,housing. repair existing decks-partial compliance to vioDetails
comply with nov 200231591 as per matt green,housing. repair existing decks-partial compliance to vio | $8,000 |