Phoenix Unlimited
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Aug 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 10 days from filing to permit and 500 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2012 | Completed final sign-off Dec 2013 | 815 Eddy St | convert 2 offices into three. relocate non-ada kitchen to new location at #120, replace non ada door to (e) deck with swing door, upgrade (e) reception desk for ada modification (e) elevator lobby with (n) smoke door.Details
convert 2 offices into three. relocate non-ada kitchen to new location at #120, replace non ada door to (e) deck with swing door, upgrade (e) reception desk for ada modification (e) elevator lobby with (n) smoke door. | $72,000 |