Back to bathroom remodel contractors
Phil Stevens Constr. Corp.
- Based in
- Novato
- On San Francisco permits
- Jun 2004 to Aug 2011
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2010 | Completed final sign-off Apr 2011 | 947 Church St | 1/f - replace damaged lath & plaster in bathroom, remove & replace tile, toilet & sink.Details
1/f - replace damaged lath & plaster in bathroom, remove & replace tile, toilet & sink. | $4,500 |
| Sep 17, 2008 | Completed final sign-off Sep 2008 | 141 Cortland Av | revision to pa# 2008/03/21/7696. reduce sclpe of work. remodel kitchen only. no work in bathroom.Details
revision to pa# 2008/03/21/7696. reduce sclpe of work. remodel kitchen only. no work in bathroom. | |
| Mar 21, 2008 | Completed final sign-off Sep 2008 | 141 Cortland Av | kitchen and bath remodel, 3 windows replacement, new lot line window, finish enclosed utility roomDetails
kitchen and bath remodel, 3 windows replacement, new lot line window, finish enclosed utility room | $20,000 |
| Feb 28, 2007 | Completed final sign-off Apr 2007 | 276 Fair Oaks St | kitchen & 2 bathroom remodel. kitchen to include new cabinets, counter, sink, appliances. baths to include baths, tub, fixtures, toilets.Details
kitchen & 2 bathroom remodel. kitchen to include new cabinets, counter, sink, appliances. baths to include baths, tub, fixtures, toilets. | $20,000 |
| Oct 31, 2006 | Completed final sign-off Feb 2007 | 20 Gilroy St | replace front stucco & rotted 1 x wood sheathing on front of building. replace with 3/4" plywood w/ 10d @ 4" edge nail. & 8" field nail. remodel kitchen. replace cabinets, counters, appliances, replace drywall within the kitchen. remodel 2 bathrooms. replace water damage drywall 40 sq. ft. inDetails
replace front stucco & rotted 1 x wood sheathing on front of building. replace with 3/4" plywood w/ 10d @ 4" edge nail. & 8" field nail. remodel kitchen. replace cabinets, counters, appliances, replace drywall within the kitchen. remodel 2 bathrooms. replace water damage drywall 40 sq. ft. in | $115,000 |
| Sep 17, 2004 | Completed final sign-off Jan 2005 | 18 Quintara St | replace old tile with new tile. bathroom remodel. replace all fixtures. replace lighting. updateDetails
replace old tile with new tile. bathroom remodel. replace all fixtures. replace lighting. update | $5,000 |