Back to bathroom remodel contractors
Phil Park Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Oct 2024
- Last 24 months
- 0 permits filed
35 permits since 2000: 31 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2010 | Completed final sign-off Oct 2010 | 1169 Guerrero St | bathroom remodel. remove and replace. tub toilet, vanity, sink, faucet, tile floor tub surround, shower valve. provide h.e. light or manual on 0.5Details
bathroom remodel. remove and replace. tub toilet, vanity, sink, faucet, tile floor tub surround, shower valve. provide h.e. light or manual on 0.5 | $9,000 |
| Apr 27, 2007 | Completed final sign-off Jul 2007 | 1837 Pine St | remodel hall and master bathrooms-new tile, accessories and fixtures.Details
remodel hall and master bathrooms-new tile, accessories and fixtures. | $30,000 |
| Dec 21, 2005 | Completed final sign-off Jul 2006 | 2259 Beach St | remodel extg kchn, bath & bdrm/replace extg wndw in extg locations at 3rd floor level in kind vinyl framed wndwsDetails
remodel extg kchn, bath & bdrm/replace extg wndw in extg locations at 3rd floor level in kind vinyl framed wndws | $30,000 |
| Nov 1, 2005 | Completed final sign-off Jul 2006 | 2257 Beach St | revision to building permit 1066423 demolition of wall and framing of new opening remodel of master bathroom to include shower extension.Details
revision to building permit 1066423 demolition of wall and framing of new opening remodel of master bathroom to include shower extension. | $8,000 |
| Jun 21, 2002 | Completed final sign-off Aug 2002 | 1725 Hayes St | remodel kitchen & bathroom-new appliances, fixtures, valves, sinks, cabs, tub shower, dishwasher, diDetails
remodel kitchen & bathroom-new appliances, fixtures, valves, sinks, cabs, tub shower, dishwasher, di | $20,000 |