Back to bathroom remodel contractors
Petru Construction Inc
- Based in
- Fairfield
- On San Francisco permits
- Mar 2021 to Nov 2025
- Last 24 months
- 4 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2025 | Completed final sign-off May 2026 | 1915 28th Av | kitchen and bathroom remodel. no walls removal, update electrical services panel & elec throughout the house and replace hvac.Details
kitchen and bathroom remodel. no walls removal, update electrical services panel & elec throughout the house and replace hvac. | $65,000 |
| Nov 21, 2025 | In progress issued Nov 2025 | 3101 Clay St | interior renovation to 4th fl, unit 5; kitchen remodel (2) bath remodel, minor reconfiguration of load bearing wall will require roof & floor reinforcement within unit no exterior alterationsDetails
interior renovation to 4th fl, unit 5; kitchen remodel (2) bath remodel, minor reconfiguration of load bearing wall will require roof & floor reinforcement within unit no exterior alterations | $62,000 |
| Dec 27, 2023 | Completed final sign-off Apr 2024 | 4210 Judah St | unit 304, kitchen remodel, bathroom remodel , new vinyl floor. replace subpanel from closet to hallway. in bathroom replace angle stop, tub valve, new strap for the tub. install new outlets in kitchen. no layout valve.Details
unit 304, kitchen remodel, bathroom remodel , new vinyl floor. replace subpanel from closet to hallway. in bathroom replace angle stop, tub valve, new strap for the tub. install new outlets in kitchen. no layout valve. | $30,000 |
| May 11, 2023 | Completed final sign-off Sep 2023 | 880 Bush St | unit 205: bathroom remodel.Details
unit 205: bathroom remodel. | $10,000 |
| Mar 5, 2021 | Completed final sign-off May 2021 | 1369 Stevenson St | one bathroom remodel, one kitchen remodel. no new wall & no existing wall relocation all new plumbing fixtures remain at same location. new lighting shall comply with cec 150.0(k). add washer and dryer in existing closet.Details
one bathroom remodel, one kitchen remodel. no new wall & no existing wall relocation all new plumbing fixtures remain at same location. new lighting shall comply with cec 150.0(k). add washer and dryer in existing closet. | $38,000 |