Peterson Construction & Development Inc.
- Based in
- Tiburon
- On San Francisco permits
- Oct 2013 to Feb 2024
- Last 24 months
- 0 permits filed
20 permits since 2000: 11 completed, 3 in progress, 6 never finaled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 170 days from filing to permit and 896 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2017 | Completed final sign-off Apr 2023 | 478 Hoffman Av | horizontal addition. (n) 3-story addition @ rear w/ 2nd fl deck. remodel (e) kitchen & add a (n) bathroom @ 3rd flDetails
horizontal addition. (n) 3-story addition @ rear w/ 2nd fl deck. remodel (e) kitchen & add a (n) bathroom @ 3rd fl | $150,000 |
| Oct 1, 2013 | Completed final sign-off Dec 2013 | 525 Rhode Island St | repair extg deck, replace guardrail at deck and stair, replace deck boards and stair treads, replace rotten framing, add flashing at deck ledgers. repair work for stair and deck less than 50% in-kind replacement, not visible from street.Details
repair extg deck, replace guardrail at deck and stair, replace deck boards and stair treads, replace rotten framing, add flashing at deck ledgers. repair work for stair and deck less than 50% in-kind replacement, not visible from street. | $5,000 |