Back to bathroom remodel contractors
Peter Spediacci Company
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Jul 2019
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2013 | Completed final sign-off Mar 2014 | 35 Capp St | remove plaster walls & ceiling, replace with 5/8 fr sheetrock. replace some trim & add insulation to exterior walls. replace tile in bathrooms on 3 units only. no change on walls and openings.Details
remove plaster walls & ceiling, replace with 5/8 fr sheetrock. replace some trim & add insulation to exterior walls. replace tile in bathrooms on 3 units only. no change on walls and openings. | $36,000 |
| Aug 6, 2012 | Completed final sign-off Oct 2012 | 1720 Quesada Av | repair leak in plumbing in lower unit, replace shower valve & bath valve, replace flooring due to water damage, check for dryrot & repair as needed, wrap heater vent pipes.Details
repair leak in plumbing in lower unit, replace shower valve & bath valve, replace flooring due to water damage, check for dryrot & repair as needed, wrap heater vent pipes. | $5,000 |
| Sep 16, 2009 | Completed final sign-off Jan 2010 | 2230 26th Av | minor remodel of bathroom. rpelace fixtures and tile bath. texture walls and paint. no structural changesDetails
minor remodel of bathroom. rpelace fixtures and tile bath. texture walls and paint. no structural changes | $6,000 |