Peter Lawlor Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Nov 2013
- Last 24 months
- 0 permits filed
17 permits since 2000: 15 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 14 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2008 | Completed final sign-off Mar 2008 | 64 Cervantes Bl | construct a 8'x17' redeood deck with stairs going down to yard, install 30" door where existing window is - at the rear of ground floor.Details
construct a 8'x17' redeood deck with stairs going down to yard, install 30" door where existing window is - at the rear of ground floor. | $10,000 |
| Dec 7, 2007 | Expired or cancelled expired Dec 2008 | 632 Banks St | replace a window with a 4 feet french door. a new deck with stair 52" above grade.Details
replace a window with a 4 feet french door. a new deck with stair 52" above grade. | $6,000 |