Back to bathroom remodel contractors
Pete Humphrey Carpentry Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Nov 2012
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2012 | Completed final sign-off Jul 2013 | 6 Steiner St | bathroom remodel- replace existing cabinets, fixtures, shower, flooring with new in same locationsDetails
bathroom remodel- replace existing cabinets, fixtures, shower, flooring with new in same locations | $25,000 |
| Nov 27, 2012 | Completed final sign-off Jul 2013 | 779 06th Av | bathroom and kitchen remodel - replace (e) cabinets, fixtures, bath tub, tile, counter top, flooring with new in same locations. all work in #779. no work in #781.Details
bathroom and kitchen remodel - replace (e) cabinets, fixtures, bath tub, tile, counter top, flooring with new in same locations. all work in #779. no work in #781. | $40,000 |
| Jul 27, 2006 | Expired or cancelled expired Jun 2009 | 170 Park St | addition to rear of building and upper floor roof profile includes upgrade kitchen and bath. add 2 bedrooms and 1 & 1/2 bathDetails
addition to rear of building and upper floor roof profile includes upgrade kitchen and bath. add 2 bedrooms and 1 & 1/2 bath | $200,000 |
| Aug 5, 2005 | Never finaled issued Aug 2005, no final | 155 Day St | top floor unit-replace (e)bathroom fixtures & rough plumbing,replace lighting,flourescent lightDetails
top floor unit-replace (e)bathroom fixtures & rough plumbing,replace lighting,flourescent light | $5,000 |
| Jul 20, 2005 | Completed final sign-off Oct 2007 | 80 Surrey St | vertical adition: a second story of 750 sq. ft. containing two bedrooms & one bath is to be added above an an existisng 811 sq.ft. single family dwelling.Details
vertical adition: a second story of 750 sq. ft. containing two bedrooms & one bath is to be added above an an existisng 811 sq.ft. single family dwelling. | $200,000 |
| Aug 22, 2002 | Completed final sign-off Nov 2002 | 3299 Folsom St | joist reinforcing per plan in bathroom remodel per planDetails
joist reinforcing per plan in bathroom remodel per plan | $5,000 |