Back to bathroom remodel contractors
Persepollis Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Sep 2023 to Jul 2026
- Last 24 months
- 7 permits filed
16 permits since 2000: 9 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 7 completed, 4 in progress. Typically 3 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Aug 2026 | 1867 25th Av | revision to pa # 202604290298 - remove rotten existing light well and rebuild rotten back deck in kind. change the layout in the bathroom that is already approved and is in scope of work and add a skylight on top of the shower.Details
revision to pa # 202604290298 - remove rotten existing light well and rebuild rotten back deck in kind. change the layout in the bathroom that is already approved and is in scope of work and add a skylight on top of the shower. | $10,000 |
| Jul 29, 2026 | Completed final sign-off Oct 2026 | 2227 19th Av | add a full bathroom to the existing bedroom and change layout of existing bathroom. revision to 202606304192Details
add a full bathroom to the existing bedroom and change layout of existing bathroom. revision to 202606304192 | $10,000 |
| Jun 30, 2026 | Completed final sign-off Oct 2026 | 2227 19th Av | remodel (e) bathroom. addd one sink and laundry machine to the (e) powder room.Details
remodel (e) bathroom. addd one sink and laundry machine to the (e) powder room. | $35,000 |
| Apr 29, 2026 | In progress issued May 2026 | 1867 25th Av | replace the existing one bed/ one bath habitable space with two bed two bath on 1st story . replace and relocate the existing sliding door with new energy efficient sliding door. remove existing patio swing door with new sliding door. reduce the size of garage on 1st floor. refinish the existingDetails
replace the existing one bed/ one bath habitable space with two bed two bath on 1st story . replace and relocate the existing sliding door with new energy efficient sliding door. remove existing patio swing door with new sliding door. reduce the size of garage on 1st floor. refinish the existing | $150,000 |
| Dec 29, 2025 | Completed final sign-off Apr 2026 | 2460 Green St | bathroom remodeling - cabinet vanity and tile workDetails
bathroom remodeling - cabinet vanity and tile work | $8,000 |
| Feb 21, 2025 | In progress filed Feb 2025, not yet issued | 1206 Union St | dwelling unit -dry wall repair & upgrade electrical panel & wiring. upgrade angel stops in bathroom & kitchenDetails
dwelling unit -dry wall repair & upgrade electrical panel & wiring. upgrade angel stops in bathroom & kitchen | $7,000 |
| Mar 26, 2024 | Completed final sign-off Apr 2025 | 71 Albion St | 1/f: convert partial storage space to habitable space. (n) bathroom (n) kitchenette/wet bar/living room. (n) storage area. increase door area at rear. (n) heating system. 2/f: remodel bathroom. (n) stair interior. remodel kitchen.Details
1/f: convert partial storage space to habitable space. (n) bathroom (n) kitchenette/wet bar/living room. (n) storage area. increase door area at rear. (n) heating system. 2/f: remodel bathroom. (n) stair interior. remodel kitchen. | $121,500 |
| Feb 15, 2024 | Completed final sign-off Feb 2025 | 1366 35th Av | demo wall btw kitchen & dining. convert bedroom 3 to master bathroom & office. 270 sf family room down addition new bedroom & bathroom. new island & pantry in kitchenDetails
demo wall btw kitchen & dining. convert bedroom 3 to master bathroom & office. 270 sf family room down addition new bedroom & bathroom. new island & pantry in kitchen | $150,000 |
| Feb 7, 2024 | Completed final sign-off Nov 2024 | 1366 35th Av | remodeling the bathroom- upgrading electrical and plumbingDetails
remodeling the bathroom- upgrading electrical and plumbing | $5,000 |
| Oct 13, 2023 | In progress issued Oct 2023 | 175 23rd Av | remodel 1 bathroom and 1 kitchen in kind. non structuralDetails
remodel 1 bathroom and 1 kitchen in kind. non structural | $8,000 |
| Sep 29, 2023 | Completed final sign-off Oct 2024 | 1315 Diamond St | 1st fl: add 350 sqft living space, remove (e) 2nd int'r stairs, level (e) fl, reconf entry, connect 1st & 2nd fl, relocate (e) wet bar & laundry, add closet, enlarge (e) bedrm closet, install seismic upgrades, relocate (e). fau & water heaters. 2nd fl: open entry staircase to 1st fl add 2nd bathDetails
1st fl: add 350 sqft living space, remove (e) 2nd int'r stairs, level (e) fl, reconf entry, connect 1st & 2nd fl, relocate (e) wet bar & laundry, add closet, enlarge (e) bedrm closet, install seismic upgrades, relocate (e). fau & water heaters. 2nd fl: open entry staircase to 1st fl add 2nd bath | $100,000 |