Back to bathroom remodel contractors
Perfect Bldr. Inc/Dba: Bldg. Solutions
- Based in
- San Rafael
- On San Francisco permits
- Apr 2001 to Oct 2021
- Last 24 months
- 0 permits filed
83 permits since 2000: 63 completed, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 20 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2021 | Completed final sign-off Mar 2022 | 22 Retiro Wy | renovation of extg bathroom due to discovery of dry rot found. replace in kind. swing door to bath changed to pocket door.Details
renovation of extg bathroom due to discovery of dry rot found. replace in kind. swing door to bath changed to pocket door. | $12,225 |
| Jul 13, 2021 | Completed final sign-off Mar 2022 | 22 Retiro Wy | (1) in-kind kitchen remodel & (1) in-kind hall bath remodel, replace (e) fixtures/finishesDetails
(1) in-kind kitchen remodel & (1) in-kind hall bath remodel, replace (e) fixtures/finishes | $56,322 |
| Dec 13, 2019 | Completed final sign-off Jun 2020 | 2618 18th Av | interior remodel, bathroom removal and relocation of bathtub on lower level, remove one post n/a maherDetails
interior remodel, bathroom removal and relocation of bathtub on lower level, remove one post n/a maher | $60,000 |
| Aug 28, 2019 | Completed final sign-off Jul 2022 | 2731 Pine St | convert level 3 bedroom into a master bathroom.Details
convert level 3 bedroom into a master bathroom. | $18,000 |
| Mar 25, 2019 | Expired or cancelled expired Feb 2024 | 4424 Balboa St | convert part of (e) garage to suite/den. lower part of the slab and underpin the perimeter foundation. install new m/e/p and bathroom. reinstall (e) w/hDetails
convert part of (e) garage to suite/den. lower part of the slab and underpin the perimeter foundation. install new m/e/p and bathroom. reinstall (e) w/h | $72,588 |
| Apr 19, 2018 | Completed final sign-off Jan 2019 | 86 Homestead St | remove interior walls in living & dinning rooms, install steel beams, remodel kitchen, remodel 1st fl bathroom, garage-level revert to storage areaDetails
remove interior walls in living & dinning rooms, install steel beams, remodel kitchen, remodel 1st fl bathroom, garage-level revert to storage area | $115,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2024 | 771 Grove St | revision pa 2016-0728-3683 - replace in new size & locations, windows & doors on east elevation at side deck. construct new non-bearing walls to reconfigure spaces within unit. add bathroom under/adjacent to stairs. continue remodel of kitchen & (1) bathrm per pa 2016-0728-3683 with altered fixtureDetails
revision pa 2016-0728-3683 - replace in new size & locations, windows & doors on east elevation at side deck. construct new non-bearing walls to reconfigure spaces within unit. add bathroom under/adjacent to stairs. continue remodel of kitchen & (1) bathrm per pa 2016-0728-3683 with altered fixture | $45,000 |
| Aug 22, 2017 | Completed final sign-off Jun 2018 | 1429 Rhode Island St | removal of non-bearing walls on level 1 & reconfigure bedroom layout addition of (n) bathroom on level 2. replacement of (e) windows with no alteration to fenestration. install of fire supression sprinklers as needed. level 1 bath reconfiture layout & kitchen layout and addition of islandDetails
removal of non-bearing walls on level 1 & reconfigure bedroom layout addition of (n) bathroom on level 2. replacement of (e) windows with no alteration to fenestration. install of fire supression sprinklers as needed. level 1 bath reconfiture layout & kitchen layout and addition of island | $67,500 |
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 2 Moneta Ct | revision to pa#201706139242, enlarge (e) bathroom, moving walls, (1) new bathroom, add walls on 2/f. 1/f family room, bedroom & bathroom permitted under pa#443780Details
revision to pa#201706139242, enlarge (e) bathroom, moving walls, (1) new bathroom, add walls on 2/f. 1/f family room, bedroom & bathroom permitted under pa#443780 | $65,000 |
| Jun 13, 2017 | Completed final sign-off Jun 2018 | 1429 Rhode Island St | one kitchen and two bathrooms remodel. interior fitting renovation. no structural or exterior alteration. no change on walls.Details
one kitchen and two bathrooms remodel. interior fitting renovation. no structural or exterior alteration. no change on walls. | $70,000 |
| Jun 13, 2017 | Completed final sign-off Jan 2018 | 2 Moneta Ct | one kitchen and one bathroom remodel and interior fittings renovation. no structural or external alteration. no change in walls.Details
one kitchen and one bathroom remodel and interior fittings renovation. no structural or external alteration. no change in walls. | $55,000 |
| Jul 28, 2016 | Completed final sign-off Aug 2024 | 771 Grove St | remodel 1 kitchen & 1 bathroom & interior fittings renovation. no structural or external alternation. work in 771 grove street only.Details
remodel 1 kitchen & 1 bathroom & interior fittings renovation. no structural or external alternation. work in 771 grove street only. | $45,000 |
| May 9, 2016 | Completed final sign-off Mar 2018 | 1610 La Playa | convert (e) ground floor office and bath into (n) second unit. expansion under (e) cantilevered room. remodel of (e) 2nd level bathroom. replace (e) second level deck w/ (n) deck (in-kind). removal of dining room wall.Details
convert (e) ground floor office and bath into (n) second unit. expansion under (e) cantilevered room. remodel of (e) 2nd level bathroom. replace (e) second level deck w/ (n) deck (in-kind). removal of dining room wall. | $400,000 |
| Feb 17, 2016 | Completed final sign-off Aug 2016 | 1562 Filbert St | remodel (2) bathrooms, patch window @ level 4 lightwell.Details
remodel (2) bathrooms, patch window @ level 4 lightwell. | $45,000 |
| Jan 8, 2016 | Completed final sign-off Sep 2016 | 2919 23rd St | unit #1 - revision to pa 2015-0910-6639: revision to master bath layout/remodel. new rear deck @ grade to include (n) outdoor grill. modification to nonstructural framing @ kitchen remodelDetails
unit #1 - revision to pa 2015-0910-6639: revision to master bath layout/remodel. new rear deck @ grade to include (n) outdoor grill. modification to nonstructural framing @ kitchen remodel | $25,000 |
| Sep 10, 2015 | Completed final sign-off Sep 2016 | 2919 23rd St | interior remodel: kitchen and 3 existing bathrooms.Details
interior remodel: kitchen and 3 existing bathrooms. | $250,000 |
| Sep 14, 2011 | Completed final sign-off Feb 2012 | 431 Prentiss St | remodel e bathroom and rpelace e flooring in e living room and hall with new. new non bearing partitons walls in bathroomDetails
remodel e bathroom and rpelace e flooring in e living room and hall with new. new non bearing partitons walls in bathroom | $50,000 |
| Dec 23, 2010 | Completed final sign-off Dec 2013 | 60 Rico Wy | 3rd story addition - 3 bedrooms, 2 baths. convert 2- 2nd story bedrooms to family room. remove (e) 2nd story rear enlarged porch, replace with new deck. convert (e) 1st story bedroom to 2nd garage parking space.Details
3rd story addition - 3 bedrooms, 2 baths. convert 2- 2nd story bedrooms to family room. remove (e) 2nd story rear enlarged porch, replace with new deck. convert (e) 1st story bedroom to 2nd garage parking space. | $300,000 |
| Nov 12, 2010 | Completed final sign-off Sep 2012 | 2110 45th Av | new partial second floor addition w/m. bedrm, closet, sitting area and room for future m. bath. remodel of exist. din rm to provide for new stairs to new 2nd fl. addition.Details
new partial second floor addition w/m. bedrm, closet, sitting area and room for future m. bath. remodel of exist. din rm to provide for new stairs to new 2nd fl. addition. | $120,000 |
| Aug 5, 2010 | Completed final sign-off Nov 2010 | 442 Elizabeth St | unit #4: repair bedroom & bathroom due to mold abatement, finishes only. replace tile floor and shower/tub. stucco repair at front elevation.Details
unit #4: repair bedroom & bathroom due to mold abatement, finishes only. replace tile floor and shower/tub. stucco repair at front elevation. | $38,000 |
| May 24, 2010 | Completed final sign-off Nov 2010 | 26 Cameo Wy | convert carport in bedroom with bathroom on ground floor another single car garage will remain (e). upgrade (e) fau to 95% and alter (e) tank style w/h to tankless hybrid.Details
convert carport in bedroom with bathroom on ground floor another single car garage will remain (e). upgrade (e) fau to 95% and alter (e) tank style w/h to tankless hybrid. | $30,000 |
| Sep 7, 2005 | Completed final sign-off Jan 2006 | 44 20th Av | work on top 2nd floor only. add a washer dryer, bathroom for bedroom # 2 and re-arrange masterDetails
work on top 2nd floor only. add a washer dryer, bathroom for bedroom # 2 and re-arrange master | $75,000 |