Percho's Construction
- Based in
- Richmond
- On San Francisco permits
- Oct 2020 to Dec 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2025 | Completed final sign-off May 2026 | 166 Locksley Av | dry rotten repair at front of the building, we will demo stucco, replace damage wood apply new water proof new stucco, paint, scaffold will need itDetails
dry rotten repair at front of the building, we will demo stucco, replace damage wood apply new water proof new stucco, paint, scaffold will need it | $22,000 |
| Sep 11, 2024 | Completed final sign-off Feb 2025 | 1910 Greenwich St | replace 8 windows at front of the building, replace siding at front, left and right side of building with hardie panel with vertival wood look to match existing. (new windows to be like for like in same openings) approx 2400 sq ft of siding hardie panel (vertical wood look)Details
replace 8 windows at front of the building, replace siding at front, left and right side of building with hardie panel with vertival wood look to match existing. (new windows to be like for like in same openings) approx 2400 sq ft of siding hardie panel (vertical wood look) | $56,529 |
| Nov 30, 2020 | Completed final sign-off May 2026 | 332 Marietta Dr | extension of kitchen footprint at rear of house, new windows on rear facade, interior rennovations of; kitchen, living room, bathrooms, tv room.Details
extension of kitchen footprint at rear of house, new windows on rear facade, interior rennovations of; kitchen, living room, bathrooms, tv room. | $50,000 |
| Oct 3, 2020 | Completed final sign-off Jul 2021 | 2698 Sutter St | interior remodel of kitchen, bathroom and convert storage closet into half bath.Details
interior remodel of kitchen, bathroom and convert storage closet into half bath. | $66,000 |