Peninsula Custom Homes Inc
- Based in
- San Carlos
- On San Francisco permits
- May 2001 to May 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 32 days from filing to permit and 576 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2020 | Completed final sign-off Oct 2020 | 2308 Buchanan St | dry rot repair of less than 50% of the cantilever deck framing "in-kind" at the existing deck at the south side of the upper floor. replace the shingles "in-kind" at the front wall at the existing residence to match the existing shingles.Details
dry rot repair of less than 50% of the cantilever deck framing "in-kind" at the existing deck at the south side of the upper floor. replace the shingles "in-kind" at the front wall at the existing residence to match the existing shingles. | $62,000 |
| Jun 26, 2019 | Completed final sign-off May 2022 | 2740 Green St | revision to app#201606281059 by reducing the scope of work including no rrof deck, no new staircase and no change to north side windows. infill extg lightwell on east side. update structural drawings.new sprinkler system and new led lighting thoughout. n/a for maherDetails
revision to app#201606281059 by reducing the scope of work including no rrof deck, no new staircase and no change to north side windows. infill extg lightwell on east side. update structural drawings.new sprinkler system and new led lighting thoughout. n/a for maher |