Back to bathroom remodel contractors
Peninsula Builders Construction
- Based in
- Redwood City
- On San Francisco permits
- Mar 2019 to Jun 2026
- Last 24 months
- 1 permit filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 in progress. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2026 | In progress issued Jun 2026 | 1501 Greenwich St | remove a bath tub to convert a shower floor, installed lineal drain, retile shower walls and floor, replace one sconce light and one vanity outlet.Details
remove a bath tub to convert a shower floor, installed lineal drain, retile shower walls and floor, replace one sconce light and one vanity outlet. | $15,575 |
| Mar 15, 2019 | Completed final sign-off Jun 2019 | 879 Greenwich St | replace e bath tub, move drain from right side to left hand side. 48" tub and build a pony wall at end of tub, new shower head and faucet, new 4 led lights, new tile floor, new wall tile paint, glass tub doorDetails
replace e bath tub, move drain from right side to left hand side. 48" tub and build a pony wall at end of tub, new shower head and faucet, new 4 led lights, new tile floor, new wall tile paint, glass tub door | $15,550 |