Back to bathroom remodel contractors
Pegasus Building/Castle Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Oct 2015
- Last 24 months
- 0 permits filed
137 permits since 2000: 129 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
50 bathroom remodel permits: 46 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2014 | Completed final sign-off Sep 2015 | 1725 Wawona St | kitchen and bathroom remodelling at the first story: replacing tile, sink and toilet. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodelling shall comply with cec 150.0(k)3 and 150.0(k)5.Details
kitchen and bathroom remodelling at the first story: replacing tile, sink and toilet. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodelling shall comply with cec 150.0(k)3 and 150.0(k)5. | $25,000 |
| May 30, 2014 | Completed final sign-off Nov 2014 | 130 Lenox Wy | new bathroom at 2nd floor. new window (2nd floor) not facing street.Details
new bathroom at 2nd floor. new window (2nd floor) not facing street. | $12,000 |
| Sep 17, 2013 | Completed final sign-off Jun 2014 | 2735 Folsom St | foundation replacement, interior remodel @ 1st story and associated structural work, remodel kitchen & bathrooms, add bath.Details
foundation replacement, interior remodel @ 1st story and associated structural work, remodel kitchen & bathrooms, add bath. | $150,000 |
| Mar 29, 2013 | Completed final sign-off Jul 2013 | 350 Claremont Bl | kitchen remodel, new bath and laundry at 3rd floor, repair dryrot at rear wall.Details
kitchen remodel, new bath and laundry at 3rd floor, repair dryrot at rear wall. | $20,000 |
| Sep 27, 2012 | Completed final sign-off Mar 2015 | 60 27th Av | comply with complaint #201259101-interior remodel-2 new windows at kitchen, 4 new windows at master bedroom. 1 new window at master bathroom. new playroom, laundry room, closet & storage at basement levelDetails
comply with complaint #201259101-interior remodel-2 new windows at kitchen, 4 new windows at master bedroom. 1 new window at master bathroom. new playroom, laundry room, closet & storage at basement level | $120,000 |
| Jul 23, 2012 | Completed final sign-off Aug 2012 | 2631 16th Av | bathroom remodel in kind (fixtures, lighting, tiles, sinks, vanity & shower/tub,Details
bathroom remodel in kind (fixtures, lighting, tiles, sinks, vanity & shower/tub, | $9,037 |
| Jun 20, 2012 | Completed final sign-off Mar 2015 | 60 27th Av | remodel 3-bathrooms, half bath & kitchen in-kind.Details
remodel 3-bathrooms, half bath & kitchen in-kind. | $40,000 |
| Apr 12, 2012 | Completed final sign-off Jun 2012 | 530 Alvarado St | remodel of existing 1st floor, add new bedroom, bath, den within existing building envelopeDetails
remodel of existing 1st floor, add new bedroom, bath, den within existing building envelope | $40,000 |
| Mar 15, 2012 | Completed final sign-off Aug 2012 | 36 Alma St | changes to upper unit of 2 unit bldg. new master bath & closet @ (e) room. renovate and revisions to existing split bath. new opening between dining & living room. relocate washer/dryer to (e) laundry. no change to area of unit. no habitable space at garage level. new skylight @ new maser bath.Details
changes to upper unit of 2 unit bldg. new master bath & closet @ (e) room. renovate and revisions to existing split bath. new opening between dining & living room. relocate washer/dryer to (e) laundry. no change to area of unit. no habitable space at garage level. new skylight @ new maser bath. | $53,000 |
| Jan 24, 2012 | Completed final sign-off Mar 2012 | 1435 05th Av | selective demo & remodel of portions of (e) upper level 3rd floor including installation of 1 new bathroom, relocation of 1 bathroom & replacement of 1 (e) window at rear. voluntary structural upgrades at rear of buildingDetails
selective demo & remodel of portions of (e) upper level 3rd floor including installation of 1 new bathroom, relocation of 1 bathroom & replacement of 1 (e) window at rear. voluntary structural upgrades at rear of building | $28,500 |
| Dec 28, 2011 | Completed final sign-off Sep 2012 | 654 Elizabeth St | remodel existing third floor, remove and relocate existing bathroom, add new bathroom, add laundry closet, reconfigure bedroom closets.Details
remodel existing third floor, remove and relocate existing bathroom, add new bathroom, add laundry closet, reconfigure bedroom closets. | $35,000 |
| Sep 13, 2011 | Completed final sign-off Sep 2011 | 827 Castro St | unit #829-revision to pa# 2011-0224-0891-add new powder room at 2nd floor, minor modifications at configuration of bathroom at 2nd floorDetails
unit #829-revision to pa# 2011-0224-0891-add new powder room at 2nd floor, minor modifications at configuration of bathroom at 2nd floor | $4,000 |
| Jul 14, 2011 | Completed final sign-off Jun 2012 | 710 Victoria St | interior remodel. excavate crawl space for new basement with new 900 sf of habitable space, new guest room,bath,ent rm, new wine cellar in bsmt.convert e sunroom at 2nd fl t new mstr bath. remove e brick chimneys.new dormer window at rear,new deck/stairs at rear. replace ex shingles in kindDetails
interior remodel. excavate crawl space for new basement with new 900 sf of habitable space, new guest room,bath,ent rm, new wine cellar in bsmt.convert e sunroom at 2nd fl t new mstr bath. remove e brick chimneys.new dormer window at rear,new deck/stairs at rear. replace ex shingles in kind | $150,000 |
| Jul 6, 2011 | Completed final sign-off Aug 2011 | 2249 Clay St | create new half bath in unit 1. remodel 2 existing baths in kind. all work at 2nd flDetails
create new half bath in unit 1. remodel 2 existing baths in kind. all work at 2nd fl | $18,000 |
| Jun 21, 2011 | Completed final sign-off Mar 2012 | 710 Victoria St | bathroom remodel in kind. high efficacy lighting or occupancy sensor.Details
bathroom remodel in kind. high efficacy lighting or occupancy sensor. | $7,500 |
| Jun 15, 2011 | Never finaled issued Jun 2011, no final | 2249 Clay St | remodel (2) existing bathrooms in kind.Details
remodel (2) existing bathrooms in kind. | $15,000 |
| May 11, 2011 | Completed final sign-off Jun 2011 | 1916 16th Av | remodel (e) bathroom in kind.Details
remodel (e) bathroom in kind. | $8,000 |
| May 10, 2011 | Completed final sign-off Jun 2011 | 1916 16th Av | create new half bath at 2nd floor.Details
create new half bath at 2nd floor. | $8,000 |
| May 4, 2011 | Completed final sign-off Jul 2011 | 2434 Jackson St | (1) bathroom remodel in kind. lighting to comply with cec 150(k)Details
(1) bathroom remodel in kind. lighting to comply with cec 150(k) | $7,300 |
| May 4, 2011 | Completed final sign-off Jun 2011 | 528 Melrose Av | remodel bathroom same location.Details
remodel bathroom same location. | $7,300 |
| May 4, 2011 | Completed final sign-off Sep 2011 | 5149 Anza St | (1) bathroom remodel in kind. lighting to comply with cec 150 (k)Details
(1) bathroom remodel in kind. lighting to comply with cec 150 (k) | $7,300 |
| Apr 13, 2011 | Completed final sign-off May 2012 | 91 Gates St | interior remodel with the addition of a bathroom at the ground floor. voluntary seismic strengthening. not to cope.Details
interior remodel with the addition of a bathroom at the ground floor. voluntary seismic strengthening. not to cope. | $30,000 |
| Mar 14, 2011 | Completed final sign-off Jun 2011 | 207 Claremont Bl | remove & replace (e) internal stair,remodel (e) kitchen,add (n) bath @ 2nd flr. add (n) conditioned hallway in ground flr,remove brick chmney & reinstate (e) bay window, remove 1 (e) int. wall,remove 1 (e) window,remove & replace 1 ext door & 4 windows, add 2 skylightsDetails
remove & replace (e) internal stair,remodel (e) kitchen,add (n) bath @ 2nd flr. add (n) conditioned hallway in ground flr,remove brick chmney & reinstate (e) bay window, remove 1 (e) int. wall,remove 1 (e) window,remove & replace 1 ext door & 4 windows, add 2 skylights | $70,000 |
| Jan 19, 2011 | Completed final sign-off Jul 2011 | 2306 29th Av | bathroom remodel at 2nd floorDetails
bathroom remodel at 2nd floor | $9,000 |
| Dec 1, 2010 | Expired or cancelled withdrawn Aug 2012 | 3912 Folsom St | remodel kitchen & bathrooms: add dormer adjacent to existing dormer. add bathroom below dormer. repair dryrot @ front facade. replace windows wood @ front vinyl @ rear.Details
remodel kitchen & bathrooms: add dormer adjacent to existing dormer. add bathroom below dormer. repair dryrot @ front facade. replace windows wood @ front vinyl @ rear. | $80,000 |
| Nov 8, 2010 | Completed final sign-off Oct 2011 | 331 Dorantes Av | add 22.5 sq. ft @ upper floor & convert 1129 sq. ft. of basement area to habitable living space. remodel kitchen, add internal stair, and add lower level bathroom.Details
add 22.5 sq. ft @ upper floor & convert 1129 sq. ft. of basement area to habitable living space. remodel kitchen, add internal stair, and add lower level bathroom. | $50,000 |
| Oct 20, 2010 | Completed final sign-off Dec 2010 | 530 Alvarado St | install new full bath rand closet at 3rd floor onlyDetails
install new full bath rand closet at 3rd floor only | $6,000 |
| Oct 1, 2010 | Completed final sign-off Nov 2010 | 757 Capp St | remodel extg bath room on 2nd floor. no structural work.Details
remodel extg bath room on 2nd floor. no structural work. | $5,000 |
| Aug 20, 2010 | Completed final sign-off Oct 2010 | 232 Fowler Av | bathroom remodel in kind, new lighting will comply with cec 150(k)Details
bathroom remodel in kind, new lighting will comply with cec 150(k) | $4,500 |
| Aug 20, 2010 | Completed final sign-off Dec 2010 | 206 Andover St | bathroom remodel in kind (no structural work) new lighting comply with cec 150Details
bathroom remodel in kind (no structural work) new lighting comply with cec 150 | $5,500 |
| Jul 28, 2010 | Completed final sign-off Oct 2010 | 47 Costa St | bathroom remodel, new tub, toilet, vanity, tile floor, update plumbing.Details
bathroom remodel, new tub, toilet, vanity, tile floor, update plumbing. | $18,500 |
| Jul 16, 2010 | Completed final sign-off Aug 2010 | 14 Hill St | remodel bath and kitchen as is. bath: high efficacy or occupancy sensor for lighting, tile+ electrical only. kitchen: at least 50% high efficacy lighting (by wattage) no change to appliances. no change to exhaust system.Details
remodel bath and kitchen as is. bath: high efficacy or occupancy sensor for lighting, tile+ electrical only. kitchen: at least 50% high efficacy lighting (by wattage) no change to appliances. no change to exhaust system. | $6,000 |
| May 21, 2010 | Never finaled issued May 2010, no final | 14 Hill St | create new corridor. move door into bathroom and enlarge bathroom to incorporate n linen closet. new closet in bedrooms, infill e opening between room. upgrade bathroom and kitchen appliances. replace e kitchen window in kind at rearDetails
create new corridor. move door into bathroom and enlarge bathroom to incorporate n linen closet. new closet in bedrooms, infill e opening between room. upgrade bathroom and kitchen appliances. replace e kitchen window in kind at rear | $12,000 |
| May 10, 2010 | Completed final sign-off Aug 2010 | 4000 Kirkham St | remodel 1-kitchen and bath (work on 2nd. flr.)Details
remodel 1-kitchen and bath (work on 2nd. flr.) | $8,200 |
| Apr 7, 2010 | Completed final sign-off Jun 2010 | 674 30th Av | remodel existing bath including fixture replacement and cabinets in kind on 2nd flDetails
remodel existing bath including fixture replacement and cabinets in kind on 2nd fl | $6,000 |
| Dec 22, 2009 | Completed final sign-off May 2010 | 77 Central Av | infill (e) lightwell against adjacent lightwell at top floor for new bath. infill (e) vacant space @ ground level for new bedroom #4. revision to pa#2009/1117/1422.Details
infill (e) lightwell against adjacent lightwell at top floor for new bath. infill (e) vacant space @ ground level for new bedroom #4. revision to pa#2009/1117/1422. | $38,000 |
| Dec 15, 2009 | Completed final sign-off Apr 2010 | 1526 Shrader St | enlarge existing master bathroom to provide new soaking tub at 2nd floor only. no structural changes.Details
enlarge existing master bathroom to provide new soaking tub at 2nd floor only. no structural changes. | $5,000 |
| Nov 17, 2009 | Completed final sign-off May 2010 | 77 Central Av | remodel (e) 3 bedrooms, 2 bathrooms & kitchen. add 1 bedroom, add (n) stairs from basement to main level.remove staris @ rear of garage. (n) skylights (flat)& drawer at top level.Details
remodel (e) 3 bedrooms, 2 bathrooms & kitchen. add 1 bedroom, add (n) stairs from basement to main level.remove staris @ rear of garage. (n) skylights (flat)& drawer at top level. | $8,000 |
| Aug 14, 2009 | Completed final sign-off Mar 2010 | 2858 Washington St | remodel master bathroom @ 2nd floor, non-structural work, replace/repair plumbing fixtures as requires, replace floor & wall tiles as required. electrical & plumbing work under separate permit.Details
remodel master bathroom @ 2nd floor, non-structural work, replace/repair plumbing fixtures as requires, replace floor & wall tiles as required. electrical & plumbing work under separate permit. | $8,000 |
| Jul 2, 2009 | Never finaled issued Jul 2009, no final | 755 29th Av | remodel third floor bath, remodel closet in 3rd. flr. bedroom. add (n) windows @ 3rd. flr.. new roof deck w/guardrail outside 3rd. flr. no work done @ 2nd. flr. & 1st. flr.Details
remodel third floor bath, remodel closet in 3rd. flr. bedroom. add (n) windows @ 3rd. flr.. new roof deck w/guardrail outside 3rd. flr. no work done @ 2nd. flr. & 1st. flr. | $26,000 |
| Jun 23, 2009 | Completed final sign-off Aug 2009 | 700 Vicente St | infill door opening, create bedroom by adding wall & door into room, relocate washer/dryer & sink. new water heater, open closet 18" off the ground (4" dryer vent connection not over 14ft). add 1 hr fire rated door w/self closer, legalize (e) full bath, half bath & batoom on garage floor/1st floor.Details
infill door opening, create bedroom by adding wall & door into room, relocate washer/dryer & sink. new water heater, open closet 18" off the ground (4" dryer vent connection not over 14ft). add 1 hr fire rated door w/self closer, legalize (e) full bath, half bath & batoom on garage floor/1st floor. | $10,000 |
| May 26, 2009 | Completed final sign-off Nov 2009 | 755 29th Av | remodel kitchen/dining & bathrooms at 2nd floor, re-frame roof per plan. remove post at ground floor upgrade beam at garage. swap window & door at 3rd floor (in front). voluntary strengthening of walls per plan.Details
remodel kitchen/dining & bathrooms at 2nd floor, re-frame roof per plan. remove post at ground floor upgrade beam at garage. swap window & door at 3rd floor (in front). voluntary strengthening of walls per plan. | $12,000 |
| Sep 30, 2008 | Completed final sign-off Apr 2009 | 356 Prentiss St | remodel of lower level, office, bedroom & full bath, kitchen & living rm on upper floor, add new french door and new windows at rear of building.Details
remodel of lower level, office, bedroom & full bath, kitchen & living rm on upper floor, add new french door and new windows at rear of building. | $30,000 |
| Aug 22, 2008 | Completed final sign-off Mar 2009 | 1430 09th Av | to remodel (e) bathroom in kind. non-structuralDetails
to remodel (e) bathroom in kind. non-structural | $6,800 |
| Jan 3, 2008 | Completed final sign-off Jul 2008 | 1863 18th Av | legalize ground floor: convert existing bonus room into master bedroom, add closet and bathroom, replace water heater to outdoor water heater, replace furnace with high efficiency furnance. replace electrical panelDetails
legalize ground floor: convert existing bonus room into master bedroom, add closet and bathroom, replace water heater to outdoor water heater, replace furnace with high efficiency furnance. replace electrical panel | $18,500 |
| Nov 15, 2007 | Completed final sign-off Sep 2008 | 130 Ulloa St | revise existing permit 1135200, 200710094890. kithen window resize & infill one window side of house. first floor bath infill 3 windows siede of house; add new skylight. ground floor bedroom replace slideing doors with french doors; infill one window side of house.all non-structural work.Details
revise existing permit 1135200, 200710094890. kithen window resize & infill one window side of house. first floor bath infill 3 windows siede of house; add new skylight. ground floor bedroom replace slideing doors with french doors; infill one window side of house.all non-structural work. | $3,000 |
| Oct 26, 2007 | Completed final sign-off Feb 2008 | 445 Baker St | remodel kitchen and bath as like. no structral work. replace windows as like. 50% lighting wattage in kitchen to be flourescent. add laundry closet. occupancy sensor. control lighting for bathroom. dryer exhaust termination shall be 3' min from property line and bldg openings. lndry clst louverd drsDetails
remodel kitchen and bath as like. no structral work. replace windows as like. 50% lighting wattage in kitchen to be flourescent. add laundry closet. occupancy sensor. control lighting for bathroom. dryer exhaust termination shall be 3' min from property line and bldg openings. lndry clst louverd drs | $50,000 |
| Oct 9, 2007 | Completed final sign-off Sep 2008 | 130 Ulloa St | kitchen remodel, bathrooms, relocate of furnace & water heater in garage.Details
kitchen remodel, bathrooms, relocate of furnace & water heater in garage. | $25,000 |
| Dec 29, 2004 | Completed final sign-off Jul 2005 | 106 Fern St | remove latt and plaster interior only no exterior work upgrade electrical and plumbing and bathroomsDetails
remove latt and plaster interior only no exterior work upgrade electrical and plumbing and bathrooms | $49,500 |
| Nov 12, 2004 | Completed final sign-off Jul 2005 | 1233 Polk St | rest.+bar renovation.ada bathrooms+bar section.remove wood columns & replace with steel i beams,Details
rest.+bar renovation.ada bathrooms+bar section.remove wood columns & replace with steel i beams, | $85,000 |