Back to bathroom remodel contractors
Pederson Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Jan 2019 to Jul 2026
- Last 24 months
- 8 permits filed
36 permits since 2000: 35 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 in progress. Typically 8 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Aug 2026 | 90 Ellsworth St | to replace a wood-framed floor above the basement/garage and replace about 100-square feet of concrete slab in an existing storage/utility/laundry room on the 1st floor, and renovate the bathroom on the 2nd/main floor.Details
to replace a wood-framed floor above the basement/garage and replace about 100-square feet of concrete slab in an existing storage/utility/laundry room on the 1st floor, and renovate the bathroom on the 2nd/main floor. | $40,000 |
| Apr 28, 2026 | Completed final sign-off Sep 2026 | 324 Park St | remodel bathroom, new layout for fixtures. change stair balustrade (guardrail). upgrade bath electrical.Details
remodel bathroom, new layout for fixtures. change stair balustrade (guardrail). upgrade bath electrical. | $50,000 |
| Jun 18, 2025 | Completed final sign-off Nov 2025 | 585 Buena Vista West Av | remodel of kitchen & bathroom. replace fixtures & cabinetry in-kind. upgrade electrical. no change in layout. in kind remodel, no moving walls. kitchen appprox. 200 sq ft. bathroom approx. 36 sq ft.Details
remodel of kitchen & bathroom. replace fixtures & cabinetry in-kind. upgrade electrical. no change in layout. in kind remodel, no moving walls. kitchen appprox. 200 sq ft. bathroom approx. 36 sq ft. | $100,000 |
| Aug 29, 2024 | Completed final sign-off Jun 2025 | 216 Sussex St | alteration of (e) single family dwelling to consist of : remodel (e) kitchen w/(n) fixtures and finishes. reuse (e) appliance in same location. remodel (e) full bath w/(n) fixtures and finsihes. relocated plumbing fixtures. (n) laundry room, relocated w&d. remove (e) closet and window @ masterDetails
alteration of (e) single family dwelling to consist of : remodel (e) kitchen w/(n) fixtures and finishes. reuse (e) appliance in same location. remodel (e) full bath w/(n) fixtures and finsihes. relocated plumbing fixtures. (n) laundry room, relocated w&d. remove (e) closet and window @ master | $97,381 |
| Dec 14, 2022 | Completed final sign-off Jun 2024 | 1987 44th Av | 1/f: to create (2) new bedrooms and a new bathroom in an existing undeveloped space. to add a new skylight. to replace the hvac systemDetails
1/f: to create (2) new bedrooms and a new bathroom in an existing undeveloped space. to add a new skylight. to replace the hvac system | $90,000 |
| Nov 17, 2021 | Completed final sign-off Dec 2022 | 2411 Pacific Av | revision to permit #202109077840. remove kitchen partition wall. move bathroom partition wall. add door for coat closet.Details
revision to permit #202109077840. remove kitchen partition wall. move bathroom partition wall. add door for coat closet. | $1,500 |
| Sep 7, 2021 | Completed final sign-off Dec 2022 | 2411 Pacific Av | remodel kitchen approx. 200 sf, new countertops, cabinets, appliances, upgrade electrical. remodel 2nd fl bathroom approx. 50 sf, new fixtures & shower surround, upgrade electrical. replace in-kind. lighting comply with cec 150.0 (k)Details
remodel kitchen approx. 200 sf, new countertops, cabinets, appliances, upgrade electrical. remodel 2nd fl bathroom approx. 50 sf, new fixtures & shower surround, upgrade electrical. replace in-kind. lighting comply with cec 150.0 (k) | $120,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2022 | 585 Buena Vista West Av | revision to 2021 0303 5767. delete scope from project: (e) 4th fl bath to remain existing. 4th fl rear deck framing to remainDetails
revision to 2021 0303 5767. delete scope from project: (e) 4th fl bath to remain existing. 4th fl rear deck framing to remain | |
| Mar 3, 2021 | Completed final sign-off Jun 2022 | 585 Buena Vista West Av | replace (e) dryrot roof decking and framing. renovate an (e) bathroom. provide a new mini split hvac system to the upper floor.Details
replace (e) dryrot roof decking and framing. renovate an (e) bathroom. provide a new mini split hvac system to the upper floor. | $75,000 |
| Jul 7, 2020 | Completed final sign-off Mar 2021 | 752 Francisco St | convert extg master bath into 2 bathrooms, partialy remove interior non bearing wall at kitchen. supply extg fireplace with new gasline.Details
convert extg master bath into 2 bathrooms, partialy remove interior non bearing wall at kitchen. supply extg fireplace with new gasline. | $50,000 |
| Jul 8, 2019 | Completed final sign-off Aug 2020 | 3733 22nd St | replace master bathroom shower surround.Details
replace master bathroom shower surround. | $15,000 |
| Jan 28, 2019 | Completed final sign-off Oct 2019 | 2411 Pacific Av | remodel 3 bathroom after water damage. upgrade electrical at area of proposed work.Details
remodel 3 bathroom after water damage. upgrade electrical at area of proposed work. | $70,000 |