Pe Management Group Inc
- Based in
- Rancho Santa Fe
- On San Francisco permits
- Jul 2025 to Jul 2025
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 in progress. Typically 170 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2025 | In progress issued Jan 2026 | 1828 Geneva Av | bldg d: repair pedestrian deck coating and expansion joints on the elevated walkways on a case by case basis. remove non-structural soffit framing that spans across expansions joints and repair stucco. install 4'x4' roof hatches at elevator #4 for the one time access to hoistways for the modernizatiDetails
bldg d: repair pedestrian deck coating and expansion joints on the elevated walkways on a case by case basis. remove non-structural soffit framing that spans across expansions joints and repair stucco. install 4'x4' roof hatches at elevator #4 for the one time access to hoistways for the modernizati | $15,000 |
| Jul 22, 2025 | In progress issued Jan 2026 | 1858 Geneva Av | bldg a: repair pedestrian deck coating and expansion joints on the elevated walkways on a case by case basis. remove non-structural soffit framing that spans across expansions joints and repair stucco. install 4'x4' roof hatches at elevator #1 for the one time access. to comply with nov # 202536811.Details
bldg a: repair pedestrian deck coating and expansion joints on the elevated walkways on a case by case basis. remove non-structural soffit framing that spans across expansions joints and repair stucco. install 4'x4' roof hatches at elevator #1 for the one time access. to comply with nov # 202536811. | $15,000 |
| Jul 22, 2025 | In progress issued Jan 2026 | 1838 Geneva Av | bldg c: repair pedestrian deck coating and expansion joints on the elevated walkways on a case by case basis. remove non-structural soffit framing that spans across expansions joints and repair stucco. to comply with nov # 202536811.Details
bldg c: repair pedestrian deck coating and expansion joints on the elevated walkways on a case by case basis. remove non-structural soffit framing that spans across expansions joints and repair stucco. to comply with nov # 202536811. | $10,000 |