Back to bathroom remodel contractors
Paul Liang Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to Sep 2026
- Last 24 months
- 1 permit filed
37 permits since 2000: 20 completed, 2 in progress, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2024 | Completed final sign-off Aug 2025 | 642 Cabrillo St | to comply with nov: 202423622: main level- street facing: repair walls, windows, and doors. bedroom: repair window, doors, and missing wall. bathroom: repair walls and doors.Details
to comply with nov: 202423622: main level- street facing: repair walls, windows, and doors. bedroom: repair window, doors, and missing wall. bathroom: repair walls and doors. | $15,000 |
| Aug 20, 2013 | Never finaled issued Aug 2013, no final | 3414 25th St | to comply with ordinance 029-13 only; installation of (6) grab bars in sro @ each bathrooms on 2 floors.Details
to comply with ordinance 029-13 only; installation of (6) grab bars in sro @ each bathrooms on 2 floors. | $400 |
| May 10, 2013 | Completed final sign-off Nov 2013 | 27 Santa Rita Av | remodel first & second floor bathroom, add new light in dining room & family room, upgrade to service to 100 amps.Details
remodel first & second floor bathroom, add new light in dining room & family room, upgrade to service to 100 amps. | $15,000 |
| Mar 25, 2013 | Completed final sign-off Dec 2013 | 2468 34th Av | remodel the bathroom for 2nd flrDetails
remodel the bathroom for 2nd flr | $6,000 |
| Mar 19, 2001 | Completed final sign-off May 2001 | 1418 Moraga St | change bathroom tile only-non-structural work onlyDetails
change bathroom tile only-non-structural work only | $1,000 |