Paul K Vou
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Oct 2025
- Last 24 months
- 2 permits filed
42 permits since 2000: 37 completed, 3 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 2 in progress. Typically 24 days from filing to permit and 488 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2025 | In progress issued Oct 2025 | 851 Church St | remove existing decks and stairs at rear of building. replace deck and stair in similar configurationDetails
remove existing decks and stairs at rear of building. replace deck and stair in similar configuration | $15,000 |
| Dec 12, 2024 | In progress issued Apr 2025 | 217 Randall St | renovate home, remove (e) rear yard extension, relocate kitchen add half bath, (n) bedroom and stair from lower level to rear yard. renovate upper level to add bathroom,construct horizontal addition at rear to add living room and bedroom, rr windows, railings and garage door at the front facade....Details
renovate home, remove (e) rear yard extension, relocate kitchen add half bath, (n) bedroom and stair from lower level to rear yard. renovate upper level to add bathroom,construct horizontal addition at rear to add living room and bedroom, rr windows, railings and garage door at the front facade.... | $643,814 |
| Mar 15, 2022 | Completed final sign-off Jul 2024 | 105 08th Av | remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level.Details
remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level. | $150,000 |
| Feb 21, 2019 | Completed final sign-off Sep 2020 | 231 Gates St | interior renovations (n) kitchen (n) bathroom. create habitable space @ 1st floor connected to 2nd level with interior stair 2 beds, 2 baths. add (n) home office and bath @ basement level. lightwell infill @ 2nd floor blank wall of adjacent buildingDetails
interior renovations (n) kitchen (n) bathroom. create habitable space @ 1st floor connected to 2nd level with interior stair 2 beds, 2 baths. add (n) home office and bath @ basement level. lightwell infill @ 2nd floor blank wall of adjacent building | $200,000 |
| Oct 27, 2017 | Completed final sign-off Feb 2019 | 506 Banks St | create habitable space at ground floor to include a new bedroom, closet & bath. 2nd floor remodel kitchen bath, bedroom, living, and dining. add powder. reconstruction interior stair. nw 2nd floor deck and stair. lightwell infill at blank wall of adjacent bldg.Details
create habitable space at ground floor to include a new bedroom, closet & bath. 2nd floor remodel kitchen bath, bedroom, living, and dining. add powder. reconstruction interior stair. nw 2nd floor deck and stair. lightwell infill at blank wall of adjacent bldg. | $190,000 |
| Oct 5, 2006 | Completed final sign-off Apr 2007 | 1200 Taylor St | his comply complaint# 200670826. replace deteriorated furnace flues. repair weather proofing on siding. repair stairs. repair handrails.Details
his comply complaint# 200670826. replace deteriorated furnace flues. repair weather proofing on siding. repair stairs. repair handrails. | $9,300 |