Back to bathroom remodel contractors
Paul Foster Co Gen Cont
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jul 2008
- Last 24 months
- 0 permits filed
24 permits since 2000: 19 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2008 | Never finaled issued May 2008, no final | 439 Cole St | grd fl-remodel kitchen, install new double door, relocate window in kitchen, new interior window in master bath, dining rm remove closet&3 small non-structural walls. master bedrm relocate non-structural wall push out to dining area, install new door, bath install new door. hallway remove closet&...Details
grd fl-remodel kitchen, install new double door, relocate window in kitchen, new interior window in master bath, dining rm remove closet&3 small non-structural walls. master bedrm relocate non-structural wall push out to dining area, install new door, bath install new door. hallway remove closet&... | $80,000 |
| Jun 13, 2007 | Completed final sign-off Apr 2008 | 136 Henry St | remodel kitchen and bath in kind. work to be in 136 unit only. repair sheet rock ceiling in living room, dining room, hallway and den for new light fixtures. elec under sep permitDetails
remodel kitchen and bath in kind. work to be in 136 unit only. repair sheet rock ceiling in living room, dining room, hallway and den for new light fixtures. elec under sep permit | $185,000 |
| Jan 4, 2005 | Completed final sign-off May 2005 | 340 San Benito Wy | no structural work, (2) bath remodel, remove existing tile & plumbing fixtures replace w/new bathtubDetails
no structural work, (2) bath remodel, remove existing tile & plumbing fixtures replace w/new bathtub | $55,000 |
| Mar 5, 2001 | Completed final sign-off Jan 2002 | 55 Robinhood Dr | remove existing kitchen cabinets and bathroom fixtures install new kitchen cabients countertops lighDetails
remove existing kitchen cabinets and bathroom fixtures install new kitchen cabients countertops ligh | $130,000 |
| Jul 21, 2000 | Completed final sign-off May 2001 | 35 Margaret Av | remodel kitchen & bath, cabinets, new floor, countertops, new tile, in toilet, sinksDetails
remodel kitchen & bath, cabinets, new floor, countertops, new tile, in toilet, sinks | $80,000 |